Tag Archive: Ascension

May 25 2018

Operations Summary – Week of 5/21/18

View post on imgur.com

View operations details »

May 21 2018

Deuce Science Flight 5

Commander Valentina and Captain Jebediah perform an aerial survey of a mountainous region dubbed Area B-1F while also testing out a new camera for the Ascension program

View full tweet timeline »

May 11 2018

Operations Summary – Week of 5/7/18

View post on imgur.com

View operations details »

Apr 27 2018

Operations Summary – Week of 4/23/18

View post on imgur.com

View operations details »

Apr 27 2018

K2-X Hot Fire Testing

The first 1.25m liquid-fueled rocket engine, designed and manufactured by NovaPunch, is integrated with its fuel tank & other flight hardware/software to perform full-system testing prior to being certified for lifting our first payload into orbit

View full tweet timeline »

Apr 20 2018

Operations Summary – Week of 4/16/18

View post on imgur.com

View operations details »

Apr 13 2018

Operations Summary – Week of 4/9/18

View post on imgur.com

View operations details »

Apr 09 2018

Surface Operations Set to Resume by Executive Order

Amazing news came out of Sheltered Rock today when the Presider himself contacted our Operations Director and Founder Drew Kerman to say he was using his executive powers to sign the amendments into law, bypassing the Assembly. This unprecedented move has tied the fate of his political career to the success of the Kerbal Space Agency, and we recognize his faith in us and plan to ensure his re-election next year by bringing kerbalkind fully into the space age. The actual signing will take place tomorrow to allow KSC and other surface structures, like the Monolith project and airports, to resume operations by Wednesday. We will be moving staff and equipment back to KSC from Umbarg over the next few days to be fully up and running again by the end of the week. Everyone is excited to really be getting back to work!

First up next week we will begin testing the K2-X engine while the VAB begins to assemble the next Progeny Mk6 Block I rockets for quick successive launches with four days turnaround time. Sheltered Rock General Airport will be able to begin the final assembly of the new Deuce aircraft this week, for completion later this month. Captain Jebediah and Commander Valentina will remain in Sheltered Rock to assist and perform testing. Specialists Bill and Bob will be getting new KerBalloons ready for launch, with an expedition being planned for next week.

Read the rest of this entry »

Apr 06 2018

Operations Summary – Week of 4/2/18

View post on imgur.com

View operations details »

Mar 16 2018

Operations Summary – Week of 3/12/18

View post on imgur.com

View operations details »

Older posts «

Fetch more items