Tag Archive: Bill

May 25 2018

High-Altitude Science Survey 42

Specialists Bob & Bill trek overland aboard Utility Task Vehicles to release a balloon over Zone MOI65 in the rough interior Highlands and collect material science data for Probodobodyne Inc

View full tweet timeline »

May 18 2018

Low-Altitude Science Survey 34

After a near-disaster in the southern sea, specialists Bob & Bill head north to Sector B-C49 to perform similar temperature gathering in a body of water that can be just as unpredictable & dangerous

View full tweet timeline »

May 11 2018

Low-Altitude Science Survey 33

Specialists Bob & Bill brave the southern sea a second time after their first attempt to reach Zone 60P-5X nearly ended in disaster thanks to a strong storm

View full tweet timeline »

May 04 2018

Operations Summary – Week of 4/30/18

View post on imgur.com

View operations details »

Apr 21 2018

High-Altitude Science Survey 41

Specialists Bob & Bill embark on another sea voyage to gather weather data over Area P3OR for L-Tech Scientific Industries

View full tweet timeline »

Apr 13 2018

Operations Summary – Week of 4/9/18

View post on imgur.com

View operations details »

Apr 09 2018

Surface Operations Set to Resume by Executive Order

Amazing news came out of Sheltered Rock today when the Presider himself contacted our Operations Director and Founder Drew Kerman to say he was using his executive powers to sign the amendments into law, bypassing the Assembly. This unprecedented move has tied the fate of his political career to the success of the Kerbal Space Agency, and we recognize his faith in us and plan to ensure his re-election next year by bringing kerbalkind fully into the space age. The actual signing will take place tomorrow to allow KSC and other surface structures, like the Monolith project and airports, to resume operations by Wednesday. We will be moving staff and equipment back to KSC from Umbarg over the next few days to be fully up and running again by the end of the week. Everyone is excited to really be getting back to work!

First up next week we will begin testing the K2-X engine while the VAB begins to assemble the next Progeny Mk6 Block I rockets for quick successive launches with four days turnaround time. Sheltered Rock General Airport will be able to begin the final assembly of the new Deuce aircraft this week, for completion later this month. Captain Jebediah and Commander Valentina will remain in Sheltered Rock to assist and perform testing. Specialists Bill and Bob will be getting new KerBalloons ready for launch, with an expedition being planned for next week.

Read the rest of this entry »

Feb 16 2018

Operations Summary – Week of 2/12/18

View post on imgur.com

View operations details »

Feb 15 2018

High-Altitude Science Survey 40

Specialists Bob & Bill embark on another long distance sea voyage to gather temperature data over Sector PHCV-843 near the Great Desert for Probodobodyne Inc

View full tweet timeline »

Feb 04 2018

Low-Altitude Science Survey 32

Specialists Bob & Bill take a sea voyage out to Site DAW-LEG to gather temperature data for Kip Engineering

View full tweet timeline »

Older posts «

Fetch more items