Tag Archive: Bob

May 11 2018

Low-Altitude Science Survey 33

Specialists Bob & Bill brave the southern sea a second time after their first attempt to reach Zone 60P-5X nearly ended in disaster thanks to a strong storm

View full tweet timeline »

Apr 21 2018

High-Altitude Science Survey 41

Specialists Bob & Bill embark on another sea voyage to gather weather data over Area P3OR for L-Tech Scientific Industries

View full tweet timeline »

Apr 13 2018

Operations Summary – Week of 4/9/18

View post on imgur.com

View operations details »

Apr 09 2018

Surface Operations Set to Resume by Executive Order

Amazing news came out of Sheltered Rock today when the Presider himself contacted our Operations Director and Founder Drew Kerman to say he was using his executive powers to sign the amendments into law, bypassing the Assembly. This unprecedented move has tied the fate of his political career to the success of the Kerbal Space Agency, and we recognize his faith in us and plan to ensure his re-election next year by bringing kerbalkind fully into the space age. The actual signing will take place tomorrow to allow KSC and other surface structures, like the Monolith project and airports, to resume operations by Wednesday. We will be moving staff and equipment back to KSC from Umbarg over the next few days to be fully up and running again by the end of the week. Everyone is excited to really be getting back to work!

First up next week we will begin testing the K2-X engine while the VAB begins to assemble the next Progeny Mk6 Block I rockets for quick successive launches with four days turnaround time. Sheltered Rock General Airport will be able to begin the final assembly of the new Deuce aircraft this week, for completion later this month. Captain Jebediah and Commander Valentina will remain in Sheltered Rock to assist and perform testing. Specialists Bill and Bob will be getting new KerBalloons ready for launch, with an expedition being planned for next week.

Read the rest of this entry »

Feb 16 2018

Operations Summary – Week of 2/12/18

View post on imgur.com

View operations details »

Feb 15 2018

High-Altitude Science Survey 40

Specialists Bob & Bill embark on another long distance sea voyage to gather temperature data over Sector PHCV-843 near the Great Desert for Probodobodyne Inc

View full tweet timeline »

Feb 04 2018

Low-Altitude Science Survey 32

Specialists Bob & Bill take a sea voyage out to Site DAW-LEG to gather temperature data for Kip Engineering

View full tweet timeline »

Jan 28 2018

Low/High-Altitude Science Surveys 31/39

Specialists Bob & Bill use every available mode of transportation – land, sea and air – to carry out two balloon releases far west of KSC over Sector GV-001 and Site 0B-RZ

View full tweet timeline »

Jan 22 2018

Deuce PR Tour KSC->KGA

We load up our entire crew aboard the Deuce to show the public how confident we are in its ability to safely carry passengers as the aircraft performs its first cross-country flight to Kravass General Airport

View full tweet timeline »

Jan 19 2018

Low-Altitude Science Survey 30

Specialist Bob is dropped off on the way home from another balloon mission to release a temperature survey balloon for Rockomax Conglomerate over Zone 9-LM7

View full tweet timeline »

Older posts «

» Newer posts