Tag Archive: Kerbin II

Nov 20 2020

Operations Summary – Weeks of 11/9 & 11/16/20

View post on imgur.com

View operations details »

Nov 12 2020

Progeny Mk7-B Flight 3 Analysis

A pause after the first two launches was required to not only build the final two rockets but also to launch the second Ascension Mk2, which required a pad reconfiguration. The pad was setup again afterwards to support Mk7-B launches and the third rocket was trucked out to the pad to perform its mission, which we hoped would finally see the rocket on a high sub-orbital trajectory with a successful hot staging to avoid losing speed on ascent. While the launch date did not change, the rocket’s new 0.625m SRB was swapped out for a refurbished SRB to test under flight conditions for the first time after making it through two static fires.

The Flight

No delays occurred during pre-launch preparations and everything was looking good for an on-time lift off when a hold was called from the weather desk just 8 seconds prior to T-0. The mountain wave sensors were tripped and due to the high instability of the rocket without its support arms a hold had to be called before they were retracted at T-5s. No gusts were recorded at KSC in the following minutes however and after some more checking on the weather data it was called as a false alarm and the countdown was reset to T-2min with a new launch time of 18:00 local. The hold was released 29 minutes after it was called. T-0 arrived without further incident, all four support arms retracted properly and the Boostertron II first stage was successfully ignited to begin the ascent.

Read the rest of this entry »

Nov 06 2020

Operations Summary – Weeks of 10/26 & 11/2/20

View post on imgur.com

View operations details »

Oct 23 2020

Operations Summary – Weeks of 10/12 & 10/19/20

View post on imgur.com

View operations details »

Oct 21 2020

Ascension Mk2 Flight 2 Analysis

Although the first orbital mission was eventually deemed a success for the payload, the Ascension Mk2 failed in its attempt to place the satellite it carried into a stable orbit. This brought the Ascension team back to the drawing board to improve the Viklun upper stage and make it more capable of maintaining attitude with its Reaction Control System cold gas thrusters. In the months since the first mission additional design work was also carried out for the next payload, dubbed Kerbin II and meant to test out technologies that would be used in the first line of communication satellites we are hoping to deploy in 2021. Once the Viklun stage improvements and payload design were finalized the rocket was assembled without issue in the VAB but the day before launch a problem occurred with installing the Radioisotope Thermal-electric Generator. The RTG was installed late in the launch preparation because the heat it outputs would compromise the fairings if left too long without thermal control, such as that provided by the crew access tower when the rocket is on the pad. Thankfully the problem was easy to overcome and the mission was only delayed to the following week.

The Flight

With no issues popping up during pre-flight the Mk2’s K2-X main engine lit up on time at T-3s under command of the AFCS, throttled at 10% power to check for good ignition. At T-0 after chamber pressures were confirmed to be nominal the 4 solid rocket boosters were ignited and their hold down bolts blown away to allow the rocket to begin its ascent with a combined force of 191kN to produce just over 1.6Gs acceleration. Immediately after launch all four of the rocket’s fins actuated to roll the rocket from 45° to 60° heading over about 6s before beginning to pitch over downrange. At the time pitch-over began the two horizontal fins nullified their ability to react to roll inputs so later in the flight at supersonic speeds control flutter would be kept to a minimum to reduce vibrations on the payload. By L+10s the SRBs had begun to taper off their thrust and the main engine throttle started to increase in order to maintain a TWR of 1.5.

Read the rest of this entry »

Oct 16 2020

Low-Altitude Science Survey 63

Releasing two balloons over Sector KD-T for Tiberdyne Aerospace this mission will take advantage of the orbiting Kerbin II to stay in communication & thus require less support to be taken along

View full tweet timeline »

Oct 09 2020

Operations Summary – Weeks of 9/28 & 10/5/20

View post on imgur.com

View operations details »

Sep 25 2020

Operations Summary – Weeks of 9/14 & 9/21/20

View post on imgur.com

View operations details »

Sep 24 2020

Ascension Mk2 Flight 2 (Kerbin II)

Continued iteration leads us to attempting another orbital insertion with the Mk2, hoping to take the payload the full distance this time rather than leaving Kerbin II to fend for itself. Will the upgraded Viklun stage be able to handle it?

View full tweet timeline »

Jul 31 2020

Operations Summary – Weeks of 7/20 & 7/27/20

View post on imgur.com

View operations details »