Tag Archive: Monolith

Oct 25 2019

Operations Summary – Week of 10/21/19

View post on imgur.com

View operations details »

Oct 24 2019

KSA Suffers Deadly Attack on Kerbed Space Mission

Click for annotated version

Earlier this week during the pre-launch operations leading up to the 3rd kerbed space mission, at approximately 16:17 UTC after tanking operations had completed and pre-flight was well underway, a Deuce aircraft came gliding in out of the darkness and slammed into the rocket. The impact was almost right in the center of the fuel tank by the aircraft’s outer left wing, causing a huge explosion. The aircraft was spun flatly around and slammed into the ground about a dozen meters away where its own fuel tanks crumpled and exploded as well. As soon at the wing penetrated the rocket fuel tank exterior however, this severed the continuity wires and triggered the automated Launch Abort System, firing the rockets in the escape tower atop the capsule to send it up and away from the resulting explosion. The chutes deployed shortly afterwards and the capsule landed hard but without injury to the occupant, Captain Jebediah, roughly 800m from the launch pad, which had gradually become engulfed in a raging ground fire as fuel and oxidizer continued to burn off. Emergency crews rushed to the scene in order to help rescue any survivors of the launch pad crew that were still working during the explosion but were unable to get close enough to fight the fire and found no one on the periphery. The 12 dead pad workers is the greatest loss of life on a KSA mission to date.

Read the rest of this entry »

Jul 19 2019

Operations Summary – Week of 7/15/19

View post on imgur.com

View operations details »

Feb 09 2019

Progeny Mk6 Block I Flight 9 Launch Update

It has been a long and frustrating day thanks to the Monolith creating difficult launch conditions. Why it’s doing this we are still unsure, although the current suspicion is it has to do with how far out into space we sent our last rocket. How it’s doing this we also don’t exactly know, although we did prove today that it cannot create and maintain a storm indefinitely. Storms require energy, in this case heat, and perhaps if we didn’t have the monolith within a structure it could use its own energy to inject heat into the air but as it is now it can only draw on existing heat. As temperatures have dropped the storm weakened and eventually completely broke down, leading to calm surface conditions. However the air in the upper atmosphere remains disturbed and we don’t know how long it will take to settle down. In the meantime though our crews have been at it for over 12 hours now and need some rest.

The rocket will remain fueled and powered up. If we power it off the Monolith with likely stop trying to generate a storm, heat energy will return to the area and if we make another launch attempt several hours from now it will likely get blocked again. This means though that the rocket will need to remain under monitoring, even if it is not armed. At 03:00 UTC half of the launch control team will go off console for a 4 hour rest break while the remainder keep an eye on the rocket. At 07:00 UTC the crews will swap and those going off console will get a 6 hour rest break. At 13:00 UTC all controllers will be back on console and we will send up another balloon to see how the upper atmosphere is doing. By 14:30 UTC we will have a better idea of conditions high above and decide whether it makes sense to continue attempting a launch.

There has been some additional speculation regarding the Monolith’s choice of tactics in stalling our launch. We know it is capable of producing an electromagnetic field that could reach the launch pad and Launch Control and be far more effective at disabling our operations. Those thinking this may have forgotten that scientists have already accepted that the EM field was not an offensive weapon. Also, generating the field again would likely require more energy than the Monolith could handle given it no longer has access to the power stations in nearby Kravass and Umbarg. Again, the storm could possibly be maintained longer or indefinitely if the Monolith had direct access to the outside air, so we may have just been lucky that we built an insulated dome around it.

Dec 21 2018

Operations Summary – Closing Out 2018

View post on imgur.com

View operations details »

Aug 21 2018

EM Field Continues to Heal Monolith at Reduced Rate

It has now been two weeks since the Monolith became active again, and since our original report a great deal has transpired. If you’ve not been able to keep up with the twitter feed, here is a recap:

The same day we released the first report, just as everyone in both Kravass and Umbarg were getting settled back in and enjoying having full power once more, everything went dark again. Well – almost. A small portion of both cavern systems stayed lit, which told the utility crews almost exactly where to look in order to find the additional crystal growths. Once again everyone had to wait for a full power shutdown, conduit replacement, and restart. The power returned and remained stable for two more days before new crystal veins had attached themselves elsewhere to suck up energy again. Because the power authorities charge flat rates, installing monitoring equipment was never a high priority and discovering a vein hooking into the system before it begins to pull massive amounts of power just isn’t possible. Tired of dealing with the constant shut downs, a new plan was formulated.

Excavations had already been performed underground, drifting along one of the main crystal veins growing from the base of the Monolith. This was along the one leading towards Sheltered Rock and Ockr to determine why it didn’t reach the caverns there (turns out it might, but a fault line broke the connection before it branched). However the two leading off towards Umbarg and Kravass have now been exposed from the surface near the caverns after days of digging to allow explosives to be lowered down and detonated. The energy-absorbing nature of the crystals took in the majority of the blast, leaving them with only minor damage and forcing work crews to manually dismantle the rest.

Read the rest of this entry »

Aug 10 2018

KSA Operations Suspended Due to Monolith Interference

Earlier this week on Tuesday just after 13:53 local time the Monolith woke up. Everyone at KSC immediately knew this as a massive electromagnetic (EM) pulse surged through all active electronics on campus and the nearby Support Village and shorted them out – in some cases in a shower of sparks and electrical arcs. Minor fires were started in some areas and brought under control as personnel began to evacuate over the causeway bridge to prepare to head for Umbarg. This evacuation plan was set in place after the first time the Monolith sent out such a discharge. Several injuries were reported from burns but no deaths occurred.

Read the rest of this entry »

Jun 01 2018

Operations Summary – Week of 5/28/18

View post on imgur.com

View operations details »

May 04 2018

Operations Summary – Week of 4/30/18

View post on imgur.com

View operations details »

Dec 22 2017

Operations Summary – Week of 12/18/17

View post on imgur.com

View operations details »

Older posts «

Fetch more items