Tag Archive: Progeny Mk7-A

Jan 13 2020

2020 Program Goals

Over the entire last week, as is per usual for the start of the operational year, numerous meetings were conducted among the various programs here at KSC where all team members were allowed to pitch ideas and voice opinions about the coming year so admin staff could work on decisions for 2020 operational goals. Thankfully all arguments remained professional – no chairs were thrown or whiteboards defaced. Here is all that we hope to accomplish this year.

Ascension Program

Still the most exciting aspect of our operations, Ascension will seek to travel higher and further than ever before starting right this month with the latest Mk1 mission to test out new guidance fins (larger versions of those that flew first on the Progeny Mk7-A) as well as attempt another RTG impact test. More details on the mission will be posted later this week when we announce a launch date. The Mk1 will also fly at least two more times this year to send Captain Jeb and Specialist Bob into space on sub-orbital missions to continue to observe the effects of zero-G on kerbals, as well as tolerance to re-entry forces.

The first flight of the Mk2, as early as February, will be entirely dependent on the performance of this month’s Mk1 mission. If successful, the new fins should give the Mk2 the control authority required to pitch over fast enough to achieve orbit. From the first mission we will aim to deploy a satellite, Kerbin I, which was announced last year. It will allow us to conduct various tests before being de-orbited due to limited battery power. The Mk2 will continue to fly throughout the year to place more payloads into space and help certify the RTG for flight so that we can send up a trio of long-lasting communications satellites by the end of the year. If the Mk2 shows itself to be a reliable vehicle, sending a kerbal into orbit before the year is out is a serious possibility but not one we will rush towards.

In the latter half of this year we hope to also debut the Mk3, the full design spec of which you can review here. This was officially approved last week although the production dates have been pushed back. The Mk3 should be the rocket that lets us send payloads into orbit around Mun and Minmus, perhaps this year.

Finally, work is also being done on the Mk1-B capsule that will debut later this year, retaining single-occupancy but upgrading various systems & design.

Read the rest of this entry »

Oct 10 2019

Progeny Mk7-A Flight 2 Analysis

After the failure of the first flight earlier this year, the Mk7 project was mostly shelved as a stand-alone endeavor to develop an orbital small-sat launcher and had to wait until it could provide more use to future Ascension designs before enough reason existed to attempt a second mission. In addition to making a second attempt at testing the steerable guidance fins, gimbaling engine and reaction wheel control system from the first mission, a new payload fairing system was introduced along with a mock-up of the radioisotope thermoelectric generator that we intended to crash into Kerbin so its casing could be tested.

The Flight

Although everything went smoothly during pre-launch operations a storm system out to sea made the weather over KSC inhospitable to rocket flight even though it was expected to improve by launch time. Forecasting is still a bit of a dark art and so we were forced to hold just outside of the final countdown at L-30 minutes and wait to see if conditions would become more receptive to launch before the end of the day cycle. Due to not needing to immediately recover the payload from the water we had no problems launching at night except for the fact that this rocket design is still new and we wanted good visual tracking conditions which meant at least some daylight. If we couldn’t launch before sunset we would have been forced to scrub for the day cycle.

Read the rest of this entry »

Sep 27 2019

Operations Summary – Week of 9/23/19

View post on imgur.com

View operations details »

Sep 26 2019

Progeny Mk7-A Flight 2 (RTG Payload Test)

The Mk7-A makes another attempt at a successful flight, igniting its 3rd stage higher for less drag and more control while also carrying a test RTG payload in new fairings – all tech that will one day benefit Ascension missions

View full tweet timeline »

Sep 20 2019

Operations Summary – Week of 9/16/19

View post on imgur.com

View operations details »

Sep 06 2019

Operations Summary – Week of 9/2/19

View post on imgur.com

View operations details »

Aug 30 2019

Operations Summary – Week of 8/26/19

View post on imgur.com

View operations details »

Aug 23 2019

Operations Summary – Week of 8/19/19

View post on imgur.com

View operations details »

Aug 16 2019

Operations Summary – Week of 8/12/19

View post on imgur.com

View operations details »

Jul 05 2019

Operations Summary – Week of 7/1/19

View post on imgur.com

View operations details »

Older posts «