Launching this month for the first time - the Progeny Mk7-B!
Asteroids of July 2020 (8/5/20)
Tying May with 12 known encounters, still the maximum number for the year so far
Alaba Trajectory Update (8/10/20)
New orbit after the 46th encounter this past weekend
Alaba Trajectory Update (8/10/20)
New orbit after the 46th encounter this past weekend
Progeny Mk7-B Rollout (8/12/20)
Heading to the launch pad for the first time atop the same carry vehicle used for Ascension rockets. Once installed atop the launch clamp and hooked to the service tower for stability, a fourth support leg will be installed
Extra System Checks (8/13/20)
When launching a new rocket, in this case the Progeny Mk7-B, it's always best to make extra, extra sure everything is working correctly, even if you have to delay a launch
Alaba Final Prediction?
Astronomers are 99% sure that the moonlet will indeed be ejected from the system over the next two months, taking into account the large trajectory changes that have in the past thrown off their propagation models. This time they think they have accounted for close Mun passes and although the exact timing of encounters may be off by several seconds or minutes the end result should be the same
Progeny Mk7-B No.1 (8/14/20)
The inaugural flight sees the rocket achieve all of its in-flight objectives however it did not fully survive re-entry and the second stage engine was not recovered as planned
Ospray Vacuum Restart (8/14/20)
While it's not the first time we've restarted an engine in flight, it is the first time for this particular engine. The lack of air pressure above the atmosphere means rapid expansion of the exhaust gases
Booster Recovery (5/14/20)
The first stage of the Progeny Mk7-B drifts back down to the Kerblantic, becoming the first booster to be recovered and hopefully even re-used one day. The VAB is just visible over the horizon
Traveling from Umbarg ~50km to the southwest the train is carrying fuel & supplies for our upcoming rocket launches. There will also be trains carrying passengers but mainly the rail service will link to cargo airplane operations
Upcoming Mission! L-0 set for 21:30 UTC on 6/23
Latest Alaba Update (6/15/20)
as expected, latest update to Alaba's orbital data shows it right on target for its next encounter at the end of this week. The shift to its orbit was very small and will continue to be minor until the 45th encounter, after which all bets could be off
Latest Alaba Update (6/15/20)
as expected, latest update to Alaba's orbital data shows it right on target for its next encounter at the end of this week. The shift to its orbit was very small and will continue to be minor until the 45th encounter, after which all bets could be off
Visitors (6/16/20)
Captain Jebediah taxis his Civvie back towards the restricted access section of the KSC, passing the public section where kerbs can fly in and park their aircraft, then catch a shuttle or train to Umbarg. Some do also have business at KSC
K2-X Delivery (6/17/20)
The lifter engine for our Ascension rockets is on its way from the airship warehouse in the Support Village to the VAB so it can be checked out and mounted to the vertical test stand (seen in the distance) for a static fire
Launch Control (6/17/20)
Our rockets may have gotten bigger over the years but the Launch Control building remains the same... for now...
Large Aircraft Hangars (6/18/20)
While we are not allowed to fully enclose large aircraft, we can at least cover them so cargo operations can stay dry when rain comes through
Kongo Airship Hangar (6/18/20)
The only above-ground structure capable of sheltering small to medium-sized airships is located at the Kongo River research base
Carry Vehicle Mate (6/19/20)
The latest Ascension Mk1 rocket to be completed gets lowered onto its carry vehicle to be rolled out to the launch pad. The Mobile Launch Platform in the rear is for Ascension Mk2 and later vehicles. Off to the left the next Ascension lift stage undergoes assembly
Captain Jebediah takes the Civvie out to measure atmospheric pollen levels in the region as part of an annual quarterly survey for the Field Research Team
Duna and Moho share a close encounter in the dawn sky, moving past each other as Duna continues to rise while Moho sets. Eve is also rising, becoming visible again after passing through inferior conjunction with Kerbin
Minmus Occults Urlum (5/31/20)
Because of its large 6° inclination (large because it's so close to us) Minmus wanders around the sky a lot an rarely encounters other nearby celestial objects. Despite Urlum's distance, its massive size still makes it appear rather large in comparison
Pink Sunrise (6/2/20)
Looking west from outside the Tracking Station as the sun finishes rising to the east and colors the clouds. Another beautiful day at KSC!
Asteroids of May 2020 (6/3/20)
The highest amount in one month so far for the year at 12, but thankfully with no known impacts
North of the Wall (6/3/20)
Releasing a low-altitude KerBalloon while looking west back towards Kravass, which is behind the Wall. That the clouds seem to stop over the ridgeline of the mountain range known as the Wall is not a coincidence. This large terrain upthrust regularly acts as a frontal boundary and stalls or redirects weather coming from the polar regions, keeping the northern plains temperate
Alaba Orbital Update (6/8/20)
The trajectory after the latest encounter, No.40
Alaba Orbital Update (6/8/20)
The trajectory after the latest encounter, No.40
Alaba Mun Encounters 6/2020-6/2021 (6/8/20)
After increasing inaccuracies in the previous prediction made back in March, and new long-term propagation was created. However although it shows Alaba is no longer ending up thrown out of the system by the end of the year, astronomers are cautious of the 45th encounter, which will see a large change in eccentricity and argument of periapsis - a similar encounter is what began to throw off the calculations from March
Alaba Mun SOI Transits 6/2020-6/2021 (6/8/20)
The paths the moonlet will take as it passes by Mun over the next year
KSC Airport Diagram Rev2 (6/10/20)
With the addition of a new runway, hangar complex and taxiways, the first half of a major renovation to support commercial/private aviation and provide a link to UmbargWith the addition of a new runway, hangar complex and taxiways, the first half of a major renovation to support commercial/private aviation and provide a link to Umbarg
Position and Hold (6/10/20)
A Deuce piloted by Commander Valentina and Captain Jebediah taxis out onto Runway 03/21 for departure, heading southeast to deploy dropsondes over a Kerblantic storm
VAB Integration Resumes (6/12/20)
After suspending operations for over two months for procedural reviews and assessment of integration processes workers are getting back to building Progeny and Ascension rockets with renewed vigor
After help from meteorologist Katgan to plot their route, Commander Valentina and Captain Jebediah deploy dropsonde probes over a storm system out in the Kerblantic for the Kerbin Weather Service
Overhead camera watches as the Boostertron II dual-segment SRB undergoes its 4th test firing. All 4 boosters that could one day strap on to an Ascension Mk3 have been successfully fired
Asteroids of March 2020 (4/2/20)
Another average month with 10 misses and one impact
Munset Sunrise (4/5/20)
Just after exiting Kerbin's shadow Mun is again tinted red as it sets behind the mountains to the west. Minmus is also visible above
Duna & Eve Appulse (4/8/20)
The near approach of the two planets as seen from Kerbin, with Eve being more than its usual double apparent size thanks to it also being 11,339,344km closer than Duna at this time
Dropsondes (4/9/20)
Meant to be dropped from the Deuce from above 5km atop severe weather so they can descend under parachute and send back to the aircraft readings on the storm below
Sunset Departure (4/9/20)
Heading southeast towards a developing storm to deploy dropsondes the Deuce leaves KSC behind as the sun sets
Captain Jebediah and Commander Valentina, with meteorologist Katgan, deploy dropsonde probes over a developing storm system out in the Kerblantic for the Kerbin Weather Service
Running alongside Rwy09/27 it will provide access to a central tarmac containing hangars and ATC along with a new Rwy03/21. Aircraft will have to still back taxi landing on Rwy09 but can exit directly off the runway to either side now when landing the more common Rwy27 approach
Scenic Route (3/18/20)
Wing cam of a Civve as Commander Valentina accepts the bumpy ride over the mountains west of KSC to soak in the views from 3.5km ASL
Scenic Route (3/18/20)
Nose cam of a Civve as Commander Valentina accepts the bumpy ride over the mountains west of KSC to soak in the views from 3.5km ASL
CommSat Tech Demo (3/19/20)
Set to launch aboard an Ascension Mk2 to ensure critical systems function properly and that the RTG can be returned safely for re-use
Launchpad Static Fire (3/19/20)
We usually use our testing stand but in this unique case we wanted to make double sure the engine was performing properly just a day prior to launch after having trouble with the engine it replaced from a week ago
Breaking Dawn (3/20/20)
Final preparations are underway for launch at KSC as the sun begins to bring light back into the sky over KSC, with the Ascension Mk1 rocket ready to go on the pad, crewed by Captain Jebediah
Ascension Mk1 No.12 (3/20/20)
Carrying Captain Jebediah up on his first trip into space after he had to endure multiple delays to his long-awaited journey
Full Canopy (3/20/20)
Captain Jebediah returns home from his first trip up into space, his canopy lit by the soft glow of the setting sun, captured with a telephoto lens from the recovery vessel while it was still ~20km away making best speed for the splashdown location
Calm Waters (3/20/20)
The talk peak upon which sits the Ockr Relay antenna keeps us in touch with Captain Jebediah as his capsule floats after splashdown and he awaits the arrival of our recovery vessel MSV Aldeny while the sun continues to set
Commander Valentina takes the Civvie out to measure atmospheric pollen levels in the region after the Civvie was repaired following her first attempt that ended up with a crash landing due to engine failure
An Ascension Mk1 heads to the launch pad, whose shadow can be seen projected upon the VAB. The MLP sits out in front. This rocket is meant to carry Captain Jebediah up into space. Rockets are often rolled out at dawn to give crews the most time during the 3-hour day to get it mounted and prepped for tanking
Storm? What Storm?? (3/11/20)
Thankfully a large weather system brewing out in the Kerblantic only brushed by offshore and pushed the launch back just one day
Crew Shuttle (3/12/20)
Passing Launch Control on its way from the Astronaut Complex out to the launch pad, carrying Captain Jebediah. The rocket is out there but not easily visible since it has been lowered for crew ingress
Mission Plan (3/12/20)
Like past kerbed flights, Jeb's mission will primarily be to measure physical response to 0G & re-entry forces
Night Time Tanking Ops (3/12/20
Under the floodlights atop the lightning towers a fuel tanker fills up the Ascension Mk1 with 7t of liquid propellants
Ch-Ch-Ch-Changes (3/12/20)
Modifications made to the upper liquid fuel bulkhead moved the nitrogen tanks up higher and necessitated that we also raise the capsule up a bit as well, creating a small enshrouded interstage gap
Awaiting Recovery (3/12/20)
MSV Aldeny, our recovery ship, waits in the waters east of Ockr. Seen over the horizon is the peak upon which sits a 150km relay antenna that allows us to stay in touch with the recovery team
Rail & Road Link (3/13/20)
Connecting to the cavern of Umbarg ~50km to the west of KSC, these two links allow freight to be transported. The rail link is the most recent addition, serving a depot that sits adjacent to the airport tarmac so cargo aircraft can be loaded/unloaded with goods for transport around the globe
we’ve also placed another order for K2-X engines. This latest Ascension Mk3 mission has shown we want to move faster than planned to the Mk4 so the thrust vector control version of the WildCat-V will begin development immediately and we will order more when that is ready
a final round of static fires last week has completed the WildCat-V’s second qualification run & we’ll know for sure by next month if it is finally ready for production. If so, two will be ready by Q3 2021 for Extremis I and a Min/Minmus mission
the Viklun upper stage will be systematically dismantled to help determine the cause of the flexing and what effect it had on the overall structural integrity of the rocket. The damage from splashdown will reduce these findings but hopefully the effort will still prove valuable
onboard vid shows the pitch oscillations during the Ascension Mk3’s ascent were way worse than we imagined – the *entire rocket flexed* 😱 inherent structural issue? Could also be from the air pressure at the nose (think boat bow slamming up & down on hvy seas) from shallow angle
when the Viklun stage splashed down the empty fuel tanks blew out, helping to alleviate impact pressure on the payload but fragments pierced the flight computer & damaged the flash memory. Onboard tlm data was lost but the ops log final mins were able to be pieced back together
one of the things that led to the win was research done by KSA scientists to prove that asteroids contain mineral wealth which could greatly alleviate the need for surface mining. We are committed to working on a system of space resource gathering for deployment later this decade
here we can say we are actually working closely with Monolithic followers to protect Kerbin’s pristine environment that developed after the asteroid strike. A major victory was won today in court with a 5-year moratorium established against surface mining
the KSA has been involved for the past two years, led by a legal team put together by Lead Scientist Cheranne, in helping environmentalists to fight against companies looking to incorporate with the purpose of mining the surface of Kerbin to extract raw materials
at this time we do not know the nature of the threat or the time frame, but given that we have suffered an attack in the past (kerbalspace.agency/?p=9965) we have no choice but to take this seriously & deal with the relatively minor inconvenience compared to a potential loss of life
there is also now apparently a threat against KSC and we have complied with orders from the government security forces earlier today that the entire facility be evacuated. We will continue to operate at limited capacity from our HQ in Umbarg until the threat has passed
the original plan to develop a 1.25m TVC vacuum engine was put on hold to instead work on the 1m vac engine suitable for payloads and also because our experience with the Progeny Mk7 made us want to get more TVC engineering data from the Mk8 for a fully TVC Ascension Mk4 by 2022
in putting together the Ascension Mk3 mission report timeline (kerbalspace.agency/?p=11619), since it is the first, we go all the way back thru the rocket’s development as well. That reminded us of this tweet outlining the Mk3’s design goals. What happened to the TVC vacuum engine?
the Viklun stage & Kerbin III have been transported via rail back to KSC after arriving in port at Umbarg on Sunday. We still have to confirm that Kerbin III remains fit for flight but visual inspection looks good. Entire Viklun stage will need to be rebuilt but that was expected
we are working on a full launch video but here is a look at initial ascent and booster drop from the ground tracking cam atop the Tracking Station & cam atop the crew tower. Bonus to upper-stage recovery is that we will get high FPS video from the booster camera for once!
our crew did not miss the launch and are excited to one day ride this rocket up into orbit. Several years ago they didn’t know for sure if they’d even get to take a ride up into space yet! The final frontier is broadening bit by bit…
post-launch operations wrapping up with the final booster heading back to the VAB where it will be inspected with the others before being shipped back to Periapsis Co. in Umbarg for refurbishment. Rocket should be back at KSC by Tuesday