Launching this month for the first time - the Progeny Mk7-B!
Asteroids of July 2020 (8/5/20)
Tying May with 12 known encounters, still the maximum number for the year so far
Alaba Trajectory Update (8/10/20)
New orbit after the 46th encounter this past weekend
Alaba Trajectory Update (8/10/20)
New orbit after the 46th encounter this past weekend
Progeny Mk7-B Rollout (8/12/20)
Heading to the launch pad for the first time atop the same carry vehicle used for Ascension rockets. Once installed atop the launch clamp and hooked to the service tower for stability, a fourth support leg will be installed
Extra System Checks (8/13/20)
When launching a new rocket, in this case the Progeny Mk7-B, it's always best to make extra, extra sure everything is working correctly, even if you have to delay a launch
Alaba Final Prediction?
Astronomers are 99% sure that the moonlet will indeed be ejected from the system over the next two months, taking into account the large trajectory changes that have in the past thrown off their propagation models. This time they think they have accounted for close Mun passes and although the exact timing of encounters may be off by several seconds or minutes the end result should be the same
Progeny Mk7-B No.1 (8/14/20)
The inaugural flight sees the rocket achieve all of its in-flight objectives however it did not fully survive re-entry and the second stage engine was not recovered as planned
Ospray Vacuum Restart (8/14/20)
While it's not the first time we've restarted an engine in flight, it is the first time for this particular engine. The lack of air pressure above the atmosphere means rapid expansion of the exhaust gases
Booster Recovery (5/14/20)
The first stage of the Progeny Mk7-B drifts back down to the Kerblantic, becoming the first booster to be recovered and hopefully even re-used one day. The VAB is just visible over the horizon
Captain Jebediah takes the Civvie out to measure atmospheric pollen levels in the region as part of an annual quarterly survey for the Field Research Team
After help from meteorologist Katgan to plot their route, Commander Valentina and Captain Jebediah deploy dropsonde probes over a storm system out in the Kerblantic for the Kerbin Weather Service
Captain Jebediah and Commander Valentina, with meteorologist Katgan, deploy dropsonde probes over a developing storm system out in the Kerblantic for the Kerbin Weather Service
Commander Valentina takes the Civvie out to measure atmospheric pollen levels in the region after the Civvie was repaired following her first attempt that ended up with a crash landing due to engine failure
we’ve also placed another order for K2-X engines. This latest Ascension Mk3 mission has shown we want to move faster than planned to the Mk4 so the thrust vector control version of the WildCat-V will begin development immediately and we will order more when that is ready
a final round of static fires last week has completed the WildCat-V’s second qualification run & we’ll know for sure by next month if it is finally ready for production. If so, two will be ready by Q3 2021 for Extremis I and a Min/Minmus mission
the Viklun upper stage will be systematically dismantled to help determine the cause of the flexing and what effect it had on the overall structural integrity of the rocket. The damage from splashdown will reduce these findings but hopefully the effort will still prove valuable
onboard vid shows the pitch oscillations during the Ascension Mk3’s ascent were way worse than we imagined – the *entire rocket flexed* 😱 inherent structural issue? Could also be from the air pressure at the nose (think boat bow slamming up & down on hvy seas) from shallow angle
when the Viklun stage splashed down the empty fuel tanks blew out, helping to alleviate impact pressure on the payload but fragments pierced the flight computer & damaged the flash memory. Onboard tlm data was lost but the ops log final mins were able to be pieced back together
one of the things that led to the win was research done by KSA scientists to prove that asteroids contain mineral wealth which could greatly alleviate the need for surface mining. We are committed to working on a system of space resource gathering for deployment later this decade
here we can say we are actually working closely with Monolithic followers to protect Kerbin’s pristine environment that developed after the asteroid strike. A major victory was won today in court with a 5-year moratorium established against surface mining
the KSA has been involved for the past two years, led by a legal team put together by Lead Scientist Cheranne, in helping environmentalists to fight against companies looking to incorporate with the purpose of mining the surface of Kerbin to extract raw materials
at this time we do not know the nature of the threat or the time frame, but given that we have suffered an attack in the past (kerbalspace.agency/?p=9965) we have no choice but to take this seriously & deal with the relatively minor inconvenience compared to a potential loss of life
there is also now apparently a threat against KSC and we have complied with orders from the government security forces earlier today that the entire facility be evacuated. We will continue to operate at limited capacity from our HQ in Umbarg until the threat has passed
the original plan to develop a 1.25m TVC vacuum engine was put on hold to instead work on the 1m vac engine suitable for payloads and also because our experience with the Progeny Mk7 made us want to get more TVC engineering data from the Mk8 for a fully TVC Ascension Mk4 by 2022
in putting together the Ascension Mk3 mission report timeline (kerbalspace.agency/?p=11619), since it is the first, we go all the way back thru the rocket’s development as well. That reminded us of this tweet outlining the Mk3’s design goals. What happened to the TVC vacuum engine?
the Viklun stage & Kerbin III have been transported via rail back to KSC after arriving in port at Umbarg on Sunday. We still have to confirm that Kerbin III remains fit for flight but visual inspection looks good. Entire Viklun stage will need to be rebuilt but that was expected
we are working on a full launch video but here is a look at initial ascent and booster drop from the ground tracking cam atop the Tracking Station & cam atop the crew tower. Bonus to upper-stage recovery is that we will get high FPS video from the booster camera for once!
our crew did not miss the launch and are excited to one day ride this rocket up into orbit. Several years ago they didn’t know for sure if they’d even get to take a ride up into space yet! The final frontier is broadening bit by bit…
post-launch operations wrapping up with the final booster heading back to the VAB where it will be inspected with the others before being shipped back to Periapsis Co. in Umbarg for refurbishment. Rocket should be back at KSC by Tuesday