Dec 06 2016

Progeny Mk2.1 Flight 1

After the disaster of the Mk2 careful review found the problem, now we just had to prove its solution was a proper fix

As the first mission of a new vehicle, this dispatch includes all the design and development leading up to launch. To skip to the launch, click here.

Profile picture
Kerbal Space Agency @KSA_MissionCtrl
we will release full video footage after we have a chance to extensively review everything to determine what's happening here twitter.com/DKerman_KSA/st…

Wed Oct 26 13:27 EDT 2016

πŸ”„ 0
❀️ 3
πŸ”–
Profile picture
Kerbal Space Agency @KSA_MissionCtrl
Simon has torn through the engineering dept making sure every memo, blueprint & scribble attributed to the Mk2 is collected for analysis

Wed Oct 26 14:32 EDT 2016

πŸ”„ 0
❀️ 1
πŸ”–
Profile picture
Kerbal Space Agency @KSA_MissionCtrl
been a long day, very trying on morale here @ KSC. What we know so far about the incident u can read in this release bit.ly/ProgenitorPR5

Wed Oct 26 17:38 EDT 2016

πŸ”„ 0
❀️ 1
πŸ’¬ View Conversation πŸ”–
Profile picture
Kerbal Space Agency @KSA_MissionCtrl
coming into work everyone is a bit glum - engineers lost a rocket, scientists lost a payload, but all are determined to figure out why

Thu Oct 27 09:06 EDT 2016

πŸ”„ 1
❀️ 2
πŸ”–
Profile picture
Kerbal Space Agency @KSA_MissionCtrl
troubling news has reached us via relay from passing airships, apparently KerBalloon team have had an accident on their way to launch site

Thu Oct 27 10:23 EDT 2016

πŸ”„ 0
❀️ 1
πŸ”–
Profile picture
Kerbal Space Agency @KSA_MissionCtrl
our launch crews have made it back to Umbarg, took them a few hours to fix up the rover to be able to travel after this debacle
Tweet media

Thu Oct 27 16:02 EDT 2016

πŸ”„ 0
❀️ 3
πŸ”–
Profile picture
Kerbal Space Agency @KSA_MissionCtrl
apparently some large ditch in a shadowed depression caught one of the rovers as it was traversing down a slope & it tumbled end over end

Thu Oct 27 16:03 EDT 2016

πŸ”„ 0
❀️ 1
πŸ”–
Profile picture
Kerbal Space Agency @KSA_MissionCtrl
Weekly Ops Summary is posted, w/ some new info on the Progeny Mk2 launch anomaly & a review of KerBalloon ops + more bit.ly/OpsSummary10-2…
Tweet media

Fri Oct 28 17:00 EDT 2016

πŸ”„ 0
❀️ 1
πŸ”–
Profile picture
Kerbal Space Agency @KSA_MissionCtrl
the KSC causeway bridges allow floodwaters to flow past the complex & to the ocean during periods of heavy rain from the western mountains
Tweet media

Sun Oct 30 13:27 EDT 2016

πŸ”„ 0
❀️ 6
πŸ”–
Profile picture
Kerbal Space Agency @KSA_MissionCtrl
rains happen more often that you may think - we generally don't report that it's raining unless it directly affects our operations somehow

Sun Oct 30 13:29 EDT 2016

πŸ”„ 0
❀️ 3
πŸ”–
Profile picture
Kerbal Space Agency @KSA_MissionCtrl
our damaged UTV is in the shop & will be fully repaired. KerBalloon unit however will need to be replaced. Some batteries were recovered too

Mon Oct 31 14:56 EDT 2016

πŸ”„ 0
❀️ 1
πŸ”–
Profile picture
Kerbal Space Agency @KSA_MissionCtrl
scientists report no change in the Monolith signal from launching closer to it with the Progeny Mk2. Radio wave emanation remains a mystery

Mon Oct 31 16:25 EDT 2016

πŸ”„ 0
❀️ 1
πŸ”–
Profile picture
Kerbal Space Agency @KSA_MissionCtrl
October was rough, the Mk2 failure def hurt us. We pledge to come back strong tho! Mortimer has posted our monthly bit.ly/FinanceReport_…

Tue Nov 01 16:55 EDT 2016

πŸ”„ 0
❀️ 1
πŸ”–
Profile picture
Kerbal Space Agency @KSA_MissionCtrl
these finance reports cover our R&D/vessel operations budget only, so u won't see how much toilet paper we buy until we have craft w/toilets

Tue Nov 01 16:57 EDT 2016

πŸ”„ 1
❀️ 3
πŸ”–
Profile picture
Kerbal Space Agency @KSA_MissionCtrl
Progeny Mk2 anomaly investigation has developed a theory that they plan to test when we receive our new KerBalloon shipment on Friday

Wed Nov 02 16:14 EDT 2016

πŸ”„ 0
❀️ 3
πŸ”–
Profile picture
Kerbal Space Agency @KSA_MissionCtrl
VAB crew spent the last 2 days putting this test booster together. Yes, the fins are on backwards. Yes, that is an explosive device attached
Tweet media

Fri Nov 04 09:36 EDT 2016

πŸ”„ 1
❀️ 2
πŸ”–
Profile picture
Kerbal Space Agency @KSA_MissionCtrl
later today at 19:00 UTC we will drop this from a KerBalloon at a height of ~250m and see if it self-ignites upon impact with the ground

Fri Nov 04 09:37 EDT 2016

πŸ”„ 0
❀️ 0
πŸ”–
Profile picture
Kerbal Space Agency @KSA_MissionCtrl
test booster is mounted to the KerBalloon and out on the pad ready for launch in <30 min. Launch control going through final checks now
Tweet media

Fri Nov 04 14:32 EDT 2016

πŸ”„ 1
❀️ 4
πŸ”–
Profile picture
Kerbal Space Agency @KSA_MissionCtrl
fins will help keep the booster stabilized as it falls to ensure that it hits the pad as square on its engine bell as possible

Fri Nov 04 14:33 EDT 2016

πŸ”„ 0
❀️ 1
πŸ”–
Profile picture
Kerbal Space Agency @KSA_MissionCtrl
L-10 min: all systems GO! which really isn't a lot, but still. Test will last approx 2 mins, will report back on success/failure after then

Fri Nov 04 14:50 EDT 2016

πŸ”„ 0
❀️ 0
πŸ”–
Profile picture
Kerbal Space Agency @KSA_MissionCtrl
successful test! We will have full video and analysis later today w/ops summary. For now, here's a nice BOOMframe from the camera footage
Tweet media

Fri Nov 04 15:07 EDT 2016

πŸ”„ 0
❀️ 6
πŸ’¬ View Conversation πŸ”–
Profile picture
Kerbal Space Agency @KSA_MissionCtrl
closing out this week with several updates, and the full test video of the Mk1-B booster from earlier today as well bit.ly/OpsSummary10-3…
Tweet media

Fri Nov 04 17:00 EDT 2016

πŸ”„ 0
❀️ 1
πŸ”–
Profile picture
Kerbal Space Agency @KSA_MissionCtrl
Mk2 investigation team reports the material stress testing has confirmed the cause of launch failure. Next steps: bit.ly/ProgenitorPR6

Wed Nov 09 16:55 EST 2016

πŸ”„ 0
❀️ 1
πŸ”–
Profile picture
Kerbal Space Agency @KSA_MissionCtrl
tl;dr - decoupler will take stress off engine fairing, MK1-B booster issues solved by end of month, return to flight will be at start of Dec

Wed Nov 09 16:56 EST 2016

πŸ”„ 1
❀️ 2
πŸ”–
Profile picture
Kerbal Space Agency @KSA_MissionCtrl
relatively slow week, but such is the pace of progress at times. Here's our ops summary. Have a great weekend! bit.ly/OpsSummary11-7…
Tweet media

Fri Nov 11 17:00 EST 2016

πŸ”„ 0
❀️ 0
πŸ”–
Profile picture
Kerbal Space Agency @KSA_MissionCtrl
Simon is busy this morning inventoring all the new rocket parts that have arrived for our Mk2.1s - still waiting on the new boosters though

Tue Nov 15 09:12 EST 2016

πŸ”„ 0
❀️ 2
πŸ”–
Profile picture
Kerbal Space Agency @KSA_MissionCtrl
would you believe Eve has just now completed an orbit around Kerbol since the start of the KSA? Let's take a moment to look back...
Tweet media

Thu Nov 17 11:40 EST 2016

πŸ”„ 0
❀️ 4
πŸ”–
Profile picture
Kerbal Space Agency @KSA_MissionCtrl
Simon is eager to get started on assembly of Progeny Mk2.1 rockets today. We'll be building a total of three to test various ascent profiles

Fri Nov 18 09:00 EST 2016

πŸ”„ 1
❀️ 3
πŸ”–
Profile picture
Kerbal Space Agency @KSA_MissionCtrl
to be a bit more specific - does the coast time between booster ignitions matter? We shall find out!

Fri Nov 18 09:50 EST 2016

πŸ”„ 0
❀️ 2
πŸ”–
Profile picture
Kerbal Space Agency @KSA_MissionCtrl
Civvie has been cleared for takeoff next week! That and more in our weekly ops review: bit.ly/OpsSummary11-1… Happy weekend to all!
Tweet media

Fri Nov 18 17:00 EST 2016

πŸ”„ 0
❀️ 1
πŸ”–
Profile picture
Kerbal Space Agency @KSA_MissionCtrl
here's a look at the new decoupler that will support the 2nd stage booster on the Progeny Mk2.1. Remains attached to 1st stage upon decouple
Tweet media

Mon Nov 21 15:51 EST 2016

πŸ”„ 0
❀️ 5
πŸ”–
Profile picture
Kerbal Space Agency @KSA_MissionCtrl
bit.ly/ProgenyMK2_1-1 craft page is live and we have a date and time for the first launch - 12/2/16 @ 20:15:00 UTC! Return to flight FTW!
Tweet media

Wed Nov 23 14:05 EST 2016

πŸ”„ 0
❀️ 1
πŸ”–
Profile picture
Kerbal Space Agency @KSA_MissionCtrl
3 Mk1-A boosters being made ready in the VAB along with 3 payload assemblies on the workbenches across the floor. Mk1-Bs arrive next week
Tweet media

Thu Nov 24 13:02 EST 2016

πŸ”„ 1
❀️ 3
πŸ”–
Profile picture
Kerbal Space Agency @KSA_MissionCtrl
ahhh the weekend here at last. Check out the bit.ly/OpsSummary11-2… before you head out for fun & relaxation! (that's your weekend, right?)
Tweet media

Fri Nov 25 17:00 EST 2016

πŸ”„ 0
❀️ 3
πŸ”–
Profile picture
Kerbal Space Agency @KSA_MissionCtrl
our Mk1-B boosters have arrived safe and sound, are in the VAB and ready to begin assembly & integration tomorrow for launch... this week!!
Tweet media

Mon Nov 28 16:26 EST 2016

πŸ”„ 0
❀️ 1
πŸ”–
Profile picture
Kerbal Space Agency @KSA_MissionCtrl
all Mk1-A boosters and the payload sections are assembled, waiting on the Mk1-Bs to be finished tomorrow to begin final integration

Tue Nov 29 11:41 EST 2016

πŸ”„ 0
❀️ 1
πŸ”–
Profile picture
Kerbal Space Agency @KSA_MissionCtrl
Simon reports that although the major sections for all 3 rockets will be ready, time for only 1 to undergo full rigors of final integration

Tue Nov 29 11:43 EST 2016

πŸ”„ 0
❀️ 1
πŸ”–
Profile picture
Kerbal Space Agency @KSA_MissionCtrl
high-surf advisory is in effect for kerbs & small vessels - there seems to be a strong storm out to sea and waves are currently over 1m

Wed Nov 30 10:31 EST 2016

πŸ”„ 0
❀️ 2
πŸ”–
Profile picture
Kerbal Space Agency @KSA_MissionCtrl
engineers are out in the north field modifying the Progeny launch base - we'll be launching the Mk2.1 at only a 5Β° angle instead of 10Β°

Wed Nov 30 13:41 EST 2016

πŸ”„ 0
❀️ 1
πŸ”–
Profile picture
Kerbal Space Agency @KSA_MissionCtrl
L-1 day & VAB crews are already hard at work to get the Mk1-B booster in place and integrated for final checks to be completed today
Tweet media

Thu Dec 01 09:34 EST 2016

πŸ”„ 1
❀️ 5
πŸ’¬ View Conversation πŸ”–
Profile picture
Kerbal Space Agency @KSA_MissionCtrl
this late-stage integration of the Mk1-B booster is a new assembly method. Simon admits its stressing him out a bit w/ just 1 day til launch

Thu Dec 01 09:37 EST 2016

πŸ”„ 0
❀️ 1
πŸ”–
Profile picture
Kerbal Space Agency @KSA_MissionCtrl
high-surf advisory is now a warning. Maritime Service reports storm at sea getting stronger, but seems to be staying offshore for us

Thu Dec 01 13:11 EST 2016

πŸ”„ 0
❀️ 3
πŸ”–
Profile picture
Kerbal Space Agency @KSA_MissionCtrl
Mortimer has closed the books on November, happy to be back to green across the board thx to KerBalloon contracts - bit.ly/FinanceReport_…

Thu Dec 01 16:43 EST 2016

πŸ”„ 0
❀️ 1
πŸ”–
Profile picture
Kerbal Space Agency @KSA_MissionCtrl
Simon has reported to Drew & Lanalye that bit.ly/ProgenyMK2_1-1 is checked out & ready to go for launch tomorrow! Everyone very excited πŸš€πŸš€

Thu Dec 01 17:28 EST 2016

πŸ”„ 0
❀️ 1
πŸ”–
Profile picture
Kerbal Space Agency @KSA_MissionCtrl
storm to the east still visible on the horizon, getting larger waves at the cape. We may not get rain but a storm surge is possible

Thu Dec 01 19:39 EST 2016

πŸ”„ 0
❀️ 0
πŸ”–
Profile picture
Kerbal Space Agency @KSA_MissionCtrl
meteorologists: high-level clouds show winds racing west, even tho pretty calm at ground lvl. Wx forecast for tomorrow is officially "iffy"

Thu Dec 01 19:40 EST 2016

πŸ”„ 0
❀️ 1
πŸ”–
Profile picture
Kerbal Space Agency @KSA_MissionCtrl
πŸŒ…Sunrise/SunsetπŸŒ„
@ KSC (UTC-5)

12/2
#2πŸŒ…08:37:03 πŸŒ„11:57:31
#3πŸŒ…14:37:54 !!πŸš€!! πŸŒ„17:58:22
#4πŸŒ…20:38:45 πŸŒ„23:59:13

12/3
#1πŸŒ…02:39:36 πŸŒ„06:00:04

Fri Dec 02 07:00 EST 2016

πŸ”„ 0
❀️ 0
πŸ”–
Profile picture
Kerbal Space Agency @KSA_MissionCtrl
light enough for a weather check. Cloud cover currently red, but hopefully will clear slightly. No rain. Will continue to monitor conditions

Fri Dec 02 08:53 EST 2016

πŸ”„ 0
❀️ 1
πŸ”–
Profile picture
Kerbal Space Agency @KSA_MissionCtrl
everyone trying hard to focus on daily work but all are eagerly awaiting start of launch prep later this morning. Here's the launch timeline
Tweet media

Fri Dec 02 09:17 EST 2016

πŸ”„ 2
❀️ 3
πŸ”–
Profile picture
Kerbal Space Agency @KSA_MissionCtrl
waves have continued to remain at around 1-2m out to sea and we have experienced a slight surge, but water staying below flood levels still

Fri Dec 02 09:22 EST 2016

πŸ”„ 0
❀️ 1
πŸ”–
Profile picture
Kerbal Space Agency @KSA_MissionCtrl
we certainly hope someday to be able to offer up a better weather picture, but for now we can mostly only observe what can be seen outside

Fri Dec 02 09:23 EST 2016

πŸ”„ 0
❀️ 1
πŸ”–
Profile picture
Kerbal Space Agency @KSA_MissionCtrl
bit.ly/ProgenyMK2_1-1 is all loaded up on the truck and waiting patiently to roll out to the north launch site, 1.2km from the launch pad
Tweet media

Fri Dec 02 10:46 EST 2016

πŸ”„ 0
❀️ 1
πŸ”–
Profile picture
Kerbal Space Agency @KSA_MissionCtrl
mess hall is serving up an early lunch, some kerbs just taking food back to their workstations. Energy ramping up. Launch prep begins soon!

Fri Dec 02 11:13 EST 2016

πŸ”„ 0
❀️ 2
πŸ”–
Profile picture
Kerbal Space Agency @KSA_MissionCtrl
L-3:30 = Wx check still red for clouds, but that can always change rapidly. Still no rain, so approval has been given for rocket rollout

Fri Dec 02 11:45 EST 2016

πŸ”„ 0
❀️ 1
πŸ”–
Profile picture
Kerbal Space Agency @KSA_MissionCtrl
L-2:00 = Flight Director Lanalye has her launch team assembled and they are going over all the pre-flight, flight & post-flight operations

Fri Dec 02 13:15 EST 2016

πŸ”„ 0
❀️ 1
πŸ”–
Profile picture
Kerbal Space Agency @KSA_MissionCtrl
cloud cover has gone green! Wx says the break in clouds may not last long but hopefully long enough to get the launch off. Fingers crossed

Fri Dec 02 13:23 EST 2016

πŸ”„ 0
❀️ 1
πŸ”–
Profile picture
Kerbal Space Agency @KSA_MissionCtrl
rocket mounting completed ahead of sched, crew standing by to assist w/any issues that occur during pre-flight checks starting in a few mins

Fri Dec 02 13:39 EST 2016

πŸ”„ 0
❀️ 2
πŸ”–
Profile picture
Kerbal Space Agency @KSA_MissionCtrl
the Progeny Mk2.1 stands 8.4m tall mounted, 5.7m tall on its own & weighs 0.450t. Initial TWR is 10.183, fairly low for this type of rocket

Fri Dec 02 13:43 EST 2016

πŸ”„ 0
❀️ 1
πŸ’¬ View Conversation πŸ”–
Profile picture
Kerbal Space Agency @KSA_MissionCtrl
fail! There was meant to be an img along with that update about the rocket being mounted. Here it is to visualize w/those specs tweeted also
Tweet media

Fri Dec 02 14:03 EST 2016

πŸ”„ 0
❀️ 1
πŸ”–
Profile picture
Kerbal Space Agency @KSA_MissionCtrl
recall the launch base has been modified to send up the Mk2.1 @ 5Β° angle instead of 10Β° for a higher apokee but still some downrange travel

Fri Dec 02 14:07 EST 2016

πŸ”„ 0
❀️ 1
πŸ”–
Profile picture
Kerbal Space Agency @KSA_MissionCtrl
L-0:50 = launch site clearing, no issues worked so far. Range safety zone is a 200m radius around site, 2km downrange cone to the west

Fri Dec 02 14:25 EST 2016

πŸ”„ 0
❀️ 2
πŸ”–
Profile picture
Kerbal Space Agency @KSA_MissionCtrl
crowds starting to gather on various rooftops again, no big Jeb-run event this time tho, astronauts are off on a 3-day wilderness excursion

Fri Dec 02 14:31 EST 2016

πŸ”„ 0
❀️ 2
πŸ”–
Profile picture
Kerbal Space Agency @KSA_MissionCtrl
L-0:30 = Lanalye reports preflight checks are completed, no issues still. Beginning launch rehearsal. Next Wx check in 10 minutes

Fri Dec 02 14:45 EST 2016

πŸ”„ 0
❀️ 2
πŸ”–
Profile picture
Kerbal Space Agency @KSA_MissionCtrl
dawn is coming, as seen from the tracking camera atop the launch control building. Sun will be fully over the horizon come launch time
Tweet media

Fri Dec 02 14:51 EST 2016

πŸ”„ 0
❀️ 2
πŸ”–
Profile picture
Kerbal Space Agency @KSA_MissionCtrl
L-0:20 = weather conditions are deteriorating, but not rapidly. Still green for clouds, but now it's looking darker to the west as well...

Fri Dec 02 14:55 EST 2016

πŸ”„ 0
❀️ 2
πŸ”–
Profile picture
Kerbal Space Agency @KSA_MissionCtrl
L-0:15 = Range Safety Officer has declared launch zone completely off-limits to any & all personnel. Visual scan shows launch zone is clear

Fri Dec 02 15:00 EST 2016

πŸ”„ 0
❀️ 2
πŸ”–
Profile picture
Kerbal Space Agency @KSA_MissionCtrl
L-0:05 = Final general polling: RSO = GO; Wx = GO; Tracking Station = GO; Launch Ctrl = GO; Flight = GO; Progeny = GO; we are GO for launch!

Fri Dec 02 15:10 EST 2016

πŸ”„ 0
❀️ 2
πŸ”–
Profile picture
Kerbal Space Agency @KSA_MissionCtrl
launch count hold! Switch over to internal power has shown a rapid drop in electric charge levels. Launch controllers are working the issue

Fri Dec 02 15:13 EST 2016

πŸ”„ 0
❀️ 1
πŸ”–
Profile picture
Kerbal Space Agency @KSA_MissionCtrl
EC drop has stabilized, but is too low for mission requirements. It seems one battery rapidly fully drained after coming off ground power

Fri Dec 02 15:15 EST 2016

πŸ”„ 0
❀️ 1
πŸ”–
Profile picture
Kerbal Space Agency @KSA_MissionCtrl
Simon & Lanalye are working with their various team leads to decide what options we have. Standby.

Fri Dec 02 15:16 EST 2016

πŸ”„ 0
❀️ 1
πŸ”–
Profile picture
Kerbal Space Agency @KSA_MissionCtrl
okay, decision made to safe the rocket, open the payload and replace the defective battery (hoping that this the one and only problem!)

Fri Dec 02 15:21 EST 2016

πŸ”„ 0
❀️ 1
πŸ”–
Profile picture
Kerbal Space Agency @KSA_MissionCtrl
new L-0 is 22:15 UTC, end of day. This is a *VERY* tight turn around time but Simon says if anyone can do it his team can. Lanalye says same

Fri Dec 02 15:22 EST 2016

πŸ”„ 0
❀️ 1
πŸ”–
Profile picture
Kerbal Space Agency @KSA_MissionCtrl
rocket has been safed, crews that were waiting outside safety zone now approaching the launch site. This will not be a quick operation

Fri Dec 02 15:39 EST 2016

πŸ”„ 0
❀️ 1
πŸ”–
Profile picture
Kerbal Space Agency @KSA_MissionCtrl
changing battery is not as simple as "pull out old, put in new" like normal batteries & payload explosive bolts have to be bypassed also

Fri Dec 02 15:40 EST 2016

πŸ”„ 0
❀️ 1
πŸ’¬ View Conversation πŸ”–
Profile picture
Kerbal Space Agency @KSA_MissionCtrl
weather has just gone red again for clouds. Could change, but it's looking pretty well overcast in just about all directions right now...

Fri Dec 02 16:12 EST 2016

πŸ”„ 0
❀️ 1
πŸ”–
Profile picture
Kerbal Space Agency @KSA_MissionCtrl
work crews are closing the rocket back up after replacing the defective battery, which will be very closely inspected back in the VAB later

Fri Dec 02 16:34 EST 2016

πŸ”„ 0
❀️ 1
πŸ”–
Profile picture
Kerbal Space Agency @KSA_MissionCtrl
hustle! hustle! Lanalye says her team needs at least 30min to roll back into full launch readiness, launch site clearing now. Will be close

Fri Dec 02 16:41 EST 2016

πŸ”„ 0
❀️ 1
πŸ”–
Profile picture
Kerbal Space Agency @KSA_MissionCtrl
launch readiness checks are well underway to come out of the hold back where we left off but Wx still remains red. Hoping for a small gap...

Fri Dec 02 16:55 EST 2016

πŸ”„ 0
❀️ 1
πŸ”–
Profile picture
Kerbal Space Agency @KSA_MissionCtrl
aaand it's just started raining. Hard. Everyone still on the roofs rushing back inside. Despite all efforts, we must scrub launch for today

Fri Dec 02 17:01 EST 2016

πŸ”„ 0
❀️ 2
πŸ’¬ View Conversation πŸ”–
Profile picture
Kerbal Space Agency @KSA_MissionCtrl
will have additional details in our weekly ops summary, which will be posted later today once we finish backing out of launch operations

Fri Dec 02 17:04 EST 2016

πŸ”„ 0
❀️ 2
πŸ”–
Profile picture
Kerbal Space Agency @KSA_MissionCtrl
mess hall is brewing up some hot drinks for the launch crew, still out in the pouring rain getting the rocket unmounted & hauled back to VAB

Fri Dec 02 17:43 EST 2016

πŸ”„ 0
❀️ 1
πŸ”–
Profile picture
Kerbal Space Agency @KSA_MissionCtrl
we will plan for another launch attempt tomorrow, despite the wknd, if the weather passes. Details & other ops news: bit.ly/OpsSummary11-2…
Tweet media

Fri Dec 02 19:18 EST 2016

πŸ”„ 0
❀️ 1
πŸ”–
Profile picture
Kerbal Space Agency @KSA_MissionCtrl
πŸŒ…Sunrise/SunsetπŸŒ„
@ KSC (UTC-5)

12/3
#2πŸŒ…08:40:27 πŸŒ„12:00:55
#3πŸŒ…14:41:18 ??πŸš€?? πŸŒ„18:01:46
#4πŸŒ…20:42:09

12/4
#1πŸŒ„00:02:37 πŸŒ…02:43:00
#2πŸŒ„06:03:28

Sat Dec 03 07:00 EST 2016

πŸ”„ 0
❀️ 0
πŸ”–
Profile picture
Kerbal Space Agency @KSA_MissionCtrl
bit.ly/ProgenyMK2_1-1 launch postponed indefinitely. Weather has not gotten better. It has, in fact, gotten worse. Storm surge increasing

Sat Dec 03 07:44 EST 2016

πŸ”„ 0
❀️ 1
πŸ”–
Profile picture
Kerbal Space Agency @KSA_MissionCtrl
all non-essential staff are being told to evacuate KSC, possibility that the tunnel access to Umbarg could become flooded later in the day

Sat Dec 03 07:46 EST 2016

πŸ”„ 0
❀️ 1
πŸ”–
Profile picture
Kerbal Space Agency @KSA_MissionCtrl
evacuation has been completed in an orderly fashion. Storm surge has pushed waters up but still not high enough to inundate KSC grounds

Sat Dec 03 11:22 EST 2016

πŸ”„ 0
❀️ 2
πŸ”–
Profile picture
Kerbal Space Agency @KSA_MissionCtrl
flood waters rising, no doubt thanks to whatever rain is falling over the mountains to the west making its way eventually down here

Sat Dec 03 15:14 EST 2016

πŸ”„ 0
❀️ 1
πŸ”–
Profile picture
Kerbal Space Agency @KSA_MissionCtrl
still raining. Still windy. Still huge waves and water lapping at the edge of the raised ground upon which KSC sits. Will it spill over?

Sat Dec 03 18:36 EST 2016

πŸ”„ 0
❀️ 2
πŸ”–
Profile picture
Kerbal Space Agency @KSA_MissionCtrl
the worst is past? Hard to say but winds and rain have both come nearly to a stop and water hasn't gotten any higher since our last update

Sat Dec 03 20:51 EST 2016

πŸ”„ 0
❀️ 1
πŸ”–
Profile picture
Kerbal Space Agency @KSA_MissionCtrl
we will report if anything happens over the next day cycle, otherwise will take full assessment of conditions tomorrow. Stay safe everyone!

Sat Dec 03 20:53 EST 2016

πŸ”„ 0
❀️ 2
πŸ”–
Profile picture
Kerbal Space Agency @KSA_MissionCtrl
and with the sun rising we can share the good news that the worst does look to be over, KSC dry. Bad news: water level still hasn't receded
Tweet media

Sun Dec 04 08:54 EST 2016

πŸ”„ 0
❀️ 2
πŸ”–
Profile picture
Kerbal Space Agency @KSA_MissionCtrl
it seems we suffered a "perfect storm" - meteorologists still working out the details of how it all came together. Will share when they do

Sun Dec 04 08:55 EST 2016

πŸ”„ 0
❀️ 1
πŸ”–
Profile picture
Kerbal Space Agency @KSA_MissionCtrl
we're unable to give a Progeny Mk2.1 launch update until waters recede enough for us to check the launch base, thankfully still out there

Sun Dec 04 14:11 EST 2016

πŸ”„ 0
❀️ 1
πŸ”–
Profile picture
Kerbal Space Agency @KSA_MissionCtrl
flood waters have fully receded, plains around KSC still soggy and mucky but crews are slogging out to check over the Progeny launch base

Mon Dec 05 09:23 EST 2016

πŸ”„ 0
❀️ 2
πŸ’¬ View Conversation πŸ”–
Profile picture
Kerbal Space Agency @KSA_MissionCtrl
relieved to find out the storm waters did no major damage to the Progeny launch base except requiring some electrical cables to be replaced

Mon Dec 05 11:11 EST 2016

πŸ”„ 0
❀️ 1
πŸ”–
Profile picture
Kerbal Space Agency @KSA_MissionCtrl
Simon reports his crews can get it fixed up today and we're just waiting on launch control & tracking station assessments from Lanalye

Mon Dec 05 11:12 EST 2016

πŸ”„ 0
❀️ 1
πŸ”–
Profile picture
Kerbal Space Agency @KSA_MissionCtrl
so it turns out the battery that failed before launch last week was one of the ones recovered from the KerBalloon rover crash back in Oct

Mon Dec 05 13:48 EST 2016

πŸ”„ 0
❀️ 1
πŸ”–
Profile picture
Kerbal Space Agency @KSA_MissionCtrl
we're still not sure what exactly went wrong with it and are re-checking the other 5 that were also recovered to see if they have any issues

Mon Dec 05 13:49 EST 2016

πŸ”„ 0
❀️ 1
πŸ”–
Profile picture
Kerbal Space Agency @KSA_MissionCtrl
nice - FD Lanalye reports LC & TS are both in great shape, ready for launch ops. bit.ly/ProgenyMK2_1-1 L-0 now set to 12/6 @ 20:30 UTC!
Tweet media

Mon Dec 05 15:14 EST 2016

πŸ”„ 0
❀️ 3
πŸ”–
Profile picture
Kerbal Space Agency @KSA_MissionCtrl
some great weather outside right now, a little breezy. Hopefully things will stay niiiice and calm this next week or so for launches
Tweet media

Mon Dec 05 16:37 EST 2016

πŸ”„ 0
❀️ 2
πŸ”–
Profile picture
Kerbal Space Agency @KSA_MissionCtrl
πŸŒ…Sunrise/SunsetπŸŒ„
@ KSC (UTC-5)

12/6
#2πŸŒ…08:50:39  
#3πŸŒ„12:11:07 πŸŒ…14:51:30 !!πŸš€!!
#4πŸŒ„18:11:58 πŸŒ…20:52:21

12/7
#1πŸŒ„00:12:49 πŸŒ…02:53:12
#2πŸŒ„06:13:40

Tue Dec 06 07:00 EST 2016

πŸ”„ 0
❀️ 0
πŸ’¬ View Conversation πŸ”–
Profile picture
Kerbal Space Agency @KSA_MissionCtrl
third time is the charm? We hope so! Launch remains on schedule for 20:30 UTC/15:30 local time. Expect updates at these countdown milestones
Tweet media

Tue Dec 06 09:09 EST 2016

πŸ”„ 0
❀️ 3
πŸ”–
Profile picture
Kerbal Space Agency @KSA_MissionCtrl
mess hall crowded, serving another early lunch as everyone gets ready to roll into pre-launch ops once we confirm weather is looking good

Tue Dec 06 11:18 EST 2016

πŸ”„ 0
❀️ 1
πŸ”–
Profile picture
Kerbal Space Agency @KSA_MissionCtrl
L-3:30 = weather check from outside the launch control building shows scattered clouds, no rain in sight. Rocket rollout given green light
Tweet media

Tue Dec 06 12:00 EST 2016

πŸ”„ 0
❀️ 1
πŸ”–
Profile picture
Kerbal Space Agency @KSA_MissionCtrl
L-3:15 = rocket is on the way out to the north launch site, 1.2km from the main launch pad, so we can launch west w/o passing over KSC
Tweet media

Tue Dec 06 12:15 EST 2016

πŸ”„ 0
❀️ 1
πŸ”–
Profile picture
Kerbal Space Agency @KSA_MissionCtrl
L-2:00 = Flight Director Lanalye and her team of launch controllers gathering for review of pre-flight, flight & post-flight procedures

Tue Dec 06 13:30 EST 2016

πŸ”„ 0
❀️ 1
πŸ”–
Profile picture
Kerbal Space Agency @KSA_MissionCtrl
L-1:30 = launch crew has the rocket mounted to the launch base, hooked up to ground power & comms so controllers can begin pre-flight

Tue Dec 06 14:00 EST 2016

πŸ”„ 0
❀️ 0
πŸ”–
Profile picture
Kerbal Space Agency @KSA_MissionCtrl
L-0:50 = no issues being worked, pre-flight on hold as launch crews clear the site to allow for checks of ignitors & other launch mechanisms
Tweet media

Tue Dec 06 14:40 EST 2016

πŸ”„ 0
❀️ 1
πŸ”–
Profile picture
Kerbal Space Agency @KSA_MissionCtrl
L-0:30 = rocket has been all checked out, launch control now in rehearsal for launch to make dbl-sure everyone knows what they're doing when

Tue Dec 06 15:00 EST 2016

πŸ”„ 0
❀️ 1
πŸ”–
Profile picture
Kerbal Space Agency @KSA_MissionCtrl
L-0:20 = launch rehearsal complete, time for another weather check and Wx kerbs report conditions remain green. Rocket remains nominal

Tue Dec 06 15:10 EST 2016

πŸ”„ 0
❀️ 1
πŸ”–
Profile picture
Kerbal Space Agency @KSA_MissionCtrl
L-0:15 = RSO locked down safety zone: 200m radius w/ 2km downrange cone. All personell clear. Astronauts bummed there's no bunker close by

Tue Dec 06 15:15 EST 2016

πŸ”„ 0
❀️ 1
πŸ”–
Profile picture
Kerbal Space Agency @KSA_MissionCtrl
L-0:05 = Final general polling: RSO = GO; Wx = GO; Tracking Station = GO; Launch Ctrl = GO; Flight = GO; Progeny = GO; we are GO for launch!

Tue Dec 06 15:25 EST 2016

πŸ”„ 1
❀️ 1
πŸ”–
Profile picture
Kerbal Space Agency @KSA_MissionCtrl
L-0:02 = rocket is off external power and controllers are keeping a watchful eye on EC levels to ensure we have two good batteries this time

Tue Dec 06 15:28 EST 2016

πŸ”„ 1
❀️ 1
πŸ”–
Profile picture
Kerbal Space Agency @KSA_MissionCtrl
L-0:01 = EC levels holding, no other issues popping up, count continues. Flight time estimated to be around 1min to chute deploy. Stand by!

Tue Dec 06 15:29 EST 2016

πŸ”„ 1
❀️ 1
πŸ”–
Profile picture
Kerbal Space Agency @KSA_MissionCtrl
cheers & high-fives here at launch ctrl! We had an excellent launch, flight - chute deployment confirmed at +0:48. Descent rate nominal

Tue Dec 06 15:31 EST 2016

πŸ”„ 1
❀️ 1
πŸ”–
Profile picture
Kerbal Space Agency @KSA_MissionCtrl
payload has landed, we're eyeballing it at about 1km from the launch site. Recovery crews enroute to check on it along with both boosters

Tue Dec 06 15:33 EST 2016

πŸ”„ 1
❀️ 1
πŸ”–
Profile picture
Kerbal Space Agency @KSA_MissionCtrl
both boosters were seen mostly intact enroute to the payload, recovery crews report payload is intact! Heading back for booster inspection

Tue Dec 06 15:37 EST 2016

πŸ”„ 1
❀️ 1
πŸ”–
Profile picture
Kerbal Space Agency @KSA_MissionCtrl
we're recovering both boosters to use in our post-flight analysis. Damage received, fuel all spent, etc etc. Congrats everyone, great job!
Tweet media

Tue Dec 06 15:45 EST 2016

πŸ”„ 1
❀️ 3
πŸ”–
Profile picture
Kerbal Space Agency @KSA_MissionCtrl
luckily we managed to pull Drew away from his desk just in time for him to enjoy... he's already reviewing Progeny Mk3 initial designs πŸ™‚ twitter.com/DKerman_KSA/st…

Tue Dec 06 16:18 EST 2016

πŸ”„ 0
❀️ 1
πŸ”–
Profile picture
Kerbal Space Agency @KSA_MissionCtrl
we've completed post-launch ops. Expect a video Thurs morning & full report with our weekly ops summary on Friday. For now, a still frame
Tweet media

Tue Dec 06 16:57 EST 2016

πŸ”„ 0
❀️ 2
πŸ”–
Profile picture
Kerbal Space Agency @KSA_MissionCtrl
lots of kerbs here early today, eager to get cracking on the telemetry & science data recovered from yesterday's flight of the Progeny Mk2.1

Wed Dec 07 08:38 EST 2016

πŸ”„ 1
❀️ 1
πŸ”–
Profile picture
Kerbal Space Agency @KSA_MissionCtrl
you can have a look at the Progeny Mk2.1 telemetry data yourself if you wish: bit.ly/ProgenyMk2_1Tlm Let us know if you have questions!
Tweet media

Wed Dec 07 09:55 EST 2016

πŸ”„ 1
❀️ 1
πŸ”–
Profile picture
Kerbal Space Agency @KSA_MissionCtrl
launch video for bit.ly/ProgenyMK2_1-1 is now available. We'll discuss the staging timing in tomorrow's report youtube.com/watch?v=8CQKNR…

Thu Dec 08 10:04 EST 2016

πŸ”„ 0
❀️ 2
πŸ”–
Profile picture
Kerbal Space Agency @KSA_MissionCtrl
We have the full report on the "perfect storm" that hit us over the prev wknd - bit.ly/StormPR Hope it's a long time 'til next time

Thu Dec 08 10:33 EST 2016

πŸ”„ 0
❀️ 1
πŸ”–
Profile picture
Kerbal Space Agency @KSA_MissionCtrl
we have good reports from Simon for both the HAB & VAB projects. Rockets should be ready by next week, will have a new launch date tomorrow

Thu Dec 08 14:09 EST 2016

πŸ”„ 0
❀️ 2
πŸ”–
Profile picture
Kerbal Space Agency @KSA_MissionCtrl
we've tossed out 3 of the remaining 5 batteries from the KerBalloon rover crash. All had small defects that only showed up under EC draw

Thu Dec 08 16:01 EST 2016

πŸ”„ 0
❀️ 4
πŸ”–
Profile picture
Kerbal Space Agency @KSA_MissionCtrl
Simon has already put in place new measures to ensure all batteries receive better testing during the final integration process

Thu Dec 08 16:02 EST 2016

πŸ”„ 0
❀️ 2
πŸ”–
Profile picture
Kerbal Space Agency @KSA_MissionCtrl
analysis of 1st Mk2.1 launch & more deets on upcoming 2nd & 3rd +more in weekly ops summary. Have a great weekend! bit.ly/OpsSummary12-5…
Tweet media

Fri Dec 09 17:00 EST 2016

πŸ”„ 0
❀️ 4
πŸ”–
Profile picture
Kerbal Space Agency @KSA_MissionCtrl
report from the engineering team on our Progeny Mk2.1 flights has been released! Check out bit.ly/ProgenitorPR8 for all the juicy details

Tue Dec 20 14:25 EST 2016

πŸ”„ 0
❀️ 3
πŸ”–