Monolith EM Field Timeline

In yet another act of interference with our operations, the Monolith produced an EM field that put launches on hold for several months. Clicking on the bookmark icon will save your spot so you can return at any time to pick up where you left off.

Profile picture
Kerbal Space Agency @KSA_MissionCtrl
hello from KSA HQ in Umbarg! Just calling out to let everyone know we are okay - electrical services are gradually coming back online in all caverns here, but KSC remains off limits until a team sent out yesterday to assess the Monolith's new activity has returned

Thu Aug 09 11:27 EDT 2018

πŸ”„ 0
❀️ 2
πŸ”–
Profile picture
Kerbal Space Agency @KSA_MissionCtrl
we will release more information on the current situation once we have a better idea what we are dealing with; the past two days have mainly been working to recover basic infrastructure & ensure all our injured employees are being taken care of

Thu Aug 09 11:29 EDT 2018

πŸ”„ 0
❀️ 2
πŸ”–
Profile picture
Kerbal Space Agency @KSA_MissionCtrl
website and Ops Tracker are now back online as electrical services here in Umbarg become more stable. Still no word from the team dispatched to KSC, but they are not overdue unless they fail to return or get in contact with us by later today

Thu Aug 09 15:04 EDT 2018

πŸ”„ 0
❀️ 1
πŸ”–
Profile picture
Kerbal Space Agency @KSA_MissionCtrl
surface team has returned, reports there is a consistent EM field over KSC, tho they found it has a radius of 10km in all directions (assumed out over the water as well) & is not specifically directed @ the space center. Generated current is strong enough to still fry electronics

Thu Aug 09 19:12 EDT 2018

πŸ”„ 0
❀️ 1
πŸ”–
Profile picture
Kerbal Space Agency @KSA_MissionCtrl
high-level KSA staff meeting will be held tomorrow to work up a full assessment of the current situation and decide what steps will be taken moving forward over the next several days. We will have details in our Ops Summary

Thu Aug 09 19:13 EDT 2018

πŸ”„ 0
❀️ 1
πŸ”–
Profile picture
Kerbal Space Agency @KSA_MissionCtrl
we have released the report on the events that occurred this past Tuesday, which will serve as our Ops Summary for this week. Additional updates will be posted as we get more information on the EM field surrounding KSC. kerbalspace.agency/?p=7917

Fri Aug 10 13:05 EDT 2018

πŸ”„ 0
❀️ 1
πŸ”–
Profile picture
Kerbal Space Agency @KSA_MissionCtrl
Lead Scientist Cheranne is leading a team back to KSC to setup monitoring equipment over this weekend so we can keep track of the EM field's size and strength over time, as well as continue to monitor for signs of toxins or radiation

Fri Aug 10 18:33 EDT 2018

πŸ”„ 0
❀️ 1
πŸ”–
Profile picture
Kerbal Space Agency @KSA_MissionCtrl
a 2nd power drain struck late on the 10th & took out the majority of Umbarg and Kravass. Where the power stopped reaching customers is the area that was searched to find the new crystal growths. Once again a full power shutdown and conduit replacement was required

Mon Aug 13 08:33 EDT 2018

πŸ”„ 0
❀️ 1
πŸ”–
Profile picture
Kerbal Space Agency @KSA_MissionCtrl
surface instruments reported prior to the 2nd blackout the EM field had begun to shrink. It has rebounded to 9km before we could shut off the power again but once more is beginning to reduce in size & could be gone by the end of the week

Mon Aug 13 08:34 EDT 2018

πŸ”„ 0
❀️ 1
πŸ”–
Profile picture
Kerbal Space Agency @KSA_MissionCtrl
EM field has continued to shrink, but as it has grown smaller the rate has decreased. It is either stabilizing via some other power source or there are already new crystals growing into power conduits. Data collection on power usage too rudimentary to know quickly

Mon Aug 13 17:50 EDT 2018

πŸ”„ 0
❀️ 1
πŸ”–
Profile picture
Kerbal Space Agency @KSA_MissionCtrl
it's impossible to also monitor all the conduits all the time, so if new crystals do decide to grow & attach themselves we probably won't know until a blackout or brownout occurs. The government & power authorities say they are working on a more permanent solution

Mon Aug 13 17:52 EDT 2018

πŸ”„ 0
❀️ 2
πŸ”–
Profile picture
Kerbal Space Agency @KSA_MissionCtrl
we've worked out the basic logistics for being able to continue most of our operations without the ability to use KSC, if needed. Right now we are waiting for a better idea of just how long-lasting this EM field is & whether there is a way to counter or disable it

Tue Aug 14 10:55 EDT 2018

πŸ”„ 0
❀️ 1
πŸ”–
Profile picture
Kerbal Space Agency @KSA_MissionCtrl
over the past wk as word has spread about the Monolith's new behavior & the vacancy of KSC religious followers have flocked to the site by any means necessary, many taking days-long journeys over land. They believe the field is meant for their sanctuary & will repel non-followers

Tue Aug 14 13:17 EDT 2018

πŸ”„ 0
❀️ 1
πŸ”–
Profile picture
Kerbal Space Agency @KSA_MissionCtrl
of course the field has no effect on any kerbal, believer or not, and government security forces have already begun their own operations to move in and remove anyone that comes within the 10km quarantine zone they setup the day after the Monolith activated

Tue Aug 14 13:18 EDT 2018

πŸ”„ 0
❀️ 1
πŸ”–
Profile picture
Kerbal Space Agency @KSA_MissionCtrl
we were not fortunate enough to be on a grid that wasn't affected by the latest brownout, which ended earlier today. With yet another conduit replacement completed, power authorities say a plan is moving forwards to sever the connection closer to the source

Fri Aug 17 11:45 EDT 2018

πŸ”„ 0
❀️ 1
πŸ”–
Profile picture
Kerbal Space Agency @KSA_MissionCtrl
the plan that we have heard from KNN reports is current excavations of the main crystal veins running to Kravass & Umbarg will be used to blow them up, creating a large enough gap that any attempts to regrow can be seen and stopped before a reconnection can be made

Fri Aug 17 11:46 EDT 2018

πŸ”„ 0
❀️ 1
πŸ”–
Profile picture
Kerbal Space Agency @KSA_MissionCtrl
meanwhile on our end we've made sure KSC security is back in place to prevent any looting or occupation by Monolithic followers hiding from government forces looking to remove them. The situation has not yet turned violent but it has grown scarily close

Fri Aug 17 11:48 EDT 2018

πŸ”„ 0
❀️ 1
πŸ”–
Profile picture
Kerbal Space Agency @KSA_MissionCtrl
after days of negotiations, we just heard on KNN that scientists have convinced the government the Monolith presents no immediate threat to kerbals near it and have made an agreement with religious leaders for followers to remain while the field is active & research is suspended

Fri Aug 17 22:06 EDT 2018

πŸ”„ 0
❀️ 1
πŸ”–
Profile picture
Kerbal Space Agency @KSA_MissionCtrl
we're very happy to see this cause frankly things were getting super tense between all 3 factions over the past several months & hopefully this will help appease everyone to some degree, calm things back down afterwards. We would hate to have to deal with fighting in our backyard

Fri Aug 17 22:07 EDT 2018

πŸ”„ 0
❀️ 2
πŸ”–
Profile picture
Kerbal Space Agency @KSA_MissionCtrl
we know what the Monolith is doing. Returning to the research site several days ago, scientists inspecting the bore hole saw it was a few cm shorter and narrower than what was last measured before the EM field sprang up. Over the past week they have watched it close up further

Sat Aug 18 09:34 EDT 2018

πŸ”„ 0
❀️ 1
πŸ”–
Profile picture
Kerbal Space Agency @KSA_MissionCtrl
much like new crystal was grown to reattach to power conduits, the hole that was drilled is slowly healing. The field has stabilized at 6km, and the hole could be healed in ~2 weeks. Whether the EM field will shut off once the hole is healed is still unknown

Sat Aug 18 09:35 EDT 2018

πŸ”„ 0
❀️ 1
πŸ”–
Profile picture
Kerbal Space Agency @KSA_MissionCtrl
this also settles the nagging problem scientists had with their initial theory, which posited the EM field was was a defensive measure. We don't need electricity to drill, but now we know doing so manually might not be faster than its healing rate

Sat Aug 18 09:36 EDT 2018

πŸ”„ 0
❀️ 1
πŸ”–
Profile picture
Kerbal Space Agency @KSA_MissionCtrl
the main crystal veins were blown up just a little while ago - or at least, the attempt was made. Although visibly damaged, they appeared to soak up the majority of the energy from the blast. Instruments at KSC recorded a slight EM field increase before it settled back to 6km

Sat Aug 18 16:06 EDT 2018

πŸ”„ 0
❀️ 1
πŸ”–
Profile picture
Kerbal Space Agency @KSA_MissionCtrl
since the explosives failed, kerbs have simply begun to hack away at the remaining structure with both manual and power tools in a final attempt to break the connection at both locations. Everyone is waiting for further updates from KNN

Sat Aug 18 16:08 EDT 2018

πŸ”„ 0
❀️ 1
πŸ”–
Profile picture
Kerbal Space Agency @KSA_MissionCtrl
kerbs working on the Kravass vein were the first to break completely through, Umbarg vein not far behind. They will continue to widen the gap while an eye is kept on the EM field size, which currently does not seem to be affected

Sat Aug 18 19:23 EDT 2018

πŸ”„ 0
❀️ 1
πŸ”–
Profile picture
Kerbal Space Agency @KSA_MissionCtrl
we have confirmation from KNN the Umbarg vein has been broken. Still no apparent response from the Monolith nor has the EM field size changed even the slightest. Researchers at the Monolith site say the bore hole continues to be filled at the same pace also

Sat Aug 18 20:31 EDT 2018

πŸ”„ 0
❀️ 1
πŸ”–
Profile picture
Kerbal Space Agency @KSA_MissionCtrl
BREAKING NEWS! We just heard from surface crew monitoring the EM field and it has begun to shrink. Round-the-clock workers on both veins have continued to chip away and prevent any new growth

Sun Aug 19 05:11 EDT 2018

πŸ”„ 0
❀️ 2
πŸ”–
Profile picture
Kerbal Space Agency @KSA_MissionCtrl
EM field has fallen to under 5km and continues to become smaller, although not continuously. It has stopped and rebounded slightly several times but the overall trend appears to be a reduction in size

Sun Aug 19 06:37 EDT 2018

πŸ”„ 0
❀️ 1
πŸ”–
Profile picture
Kerbal Space Agency @KSA_MissionCtrl
field size just collapsed rapidly from 3.8km down to 2.5km over the last ~5 minutes. If the Monolith is conserving energy, it could possibly remain stable at this size for some time before continuing to grow smaller. All KSC buildings are still within the field, barely

Sun Aug 19 07:20 EDT 2018

πŸ”„ 0
❀️ 1
πŸ”–
Profile picture
Kerbal Space Agency @KSA_MissionCtrl
latest surface update reports field size remains stable at 2.5km and still strong enough to generate dangerously high levels of current in active electronics. Crystal growth at severed vein sites appears to have stopped, same with drill hole. Unknown why EM field is still up then

Sun Aug 19 20:54 EDT 2018

πŸ”„ 0
❀️ 1
πŸ”–
Profile picture
Kerbal Space Agency @KSA_MissionCtrl
surface instruments monitoring the EM field show no change since yesterday, not even minor fluctuations. It would appear this is how much the Monolith can sustain itself without help from our power grids, perhaps it is also tapped in to some other source

Mon Aug 20 17:16 EDT 2018

πŸ”„ 0
❀️ 1
πŸ”–
Profile picture
Kerbal Space Agency @KSA_MissionCtrl
still, everyone agrees it's too early to say that this will remain constant. The rapid field collapse could mean it has enough energy reserved now only for days or weeks of continued projection. No one still knows why the field remains if crystal growth has ceased

Mon Aug 20 17:17 EDT 2018

πŸ”„ 0
❀️ 1
πŸ”–
Profile picture
Kerbal Space Agency @KSA_MissionCtrl
we now know the EM field is still active because the bore hole is in fact continuing to fill, just at a pace now only measurable in days. New estimates say it could take as long as 3 months to heal. Here is an updated report for the past 2 weeks: kerbalspace.agency/?p=7933
Tweet media

Tue Aug 21 16:17 EDT 2018

πŸ”„ 0
❀️ 2
πŸ’¬ View Conversation πŸ”–
Profile picture
Kerbal Space Agency @KSA_MissionCtrl
this was taken standing just outside the 2.5km outer edge of the EM field (near the engine test stand). You can make out some of the larger tents setup around the burn scar off in the distance near the Monolith research dome if you look closely
Tweet media

Wed Aug 22 09:51 EDT 2018

πŸ”„ 0
❀️ 1
πŸ”–
Profile picture
Kerbal Space Agency @KSA_MissionCtrl
report from KNN on the pilgrims surrounding the Monolith talks about how many feel "cleansed" and rejuvenated. We can assure you there is no scientific research being done right now on any health benefits from EM field immersion

Wed Aug 22 14:20 EDT 2018

πŸ”„ 0
❀️ 1
πŸ”–
Profile picture
Kerbal Space Agency @KSA_MissionCtrl
in case anyone recalls us speaking about various KSC buildings being "shielded", which we have in the past, that was against background planetary EM to ensure instruments can be calibrated properly. This localized EM field is much, much stronger

Thu Aug 23 11:01 EDT 2018

πŸ”„ 0
❀️ 1
πŸ”–
Profile picture
Kerbal Space Agency @KSA_MissionCtrl
it seems KSC security has more to deal with than Monolith pilgrims (who have not been a problem, by the way - just a potential one). Two daredevils managed to sneak on campus, break into the VAB and parachute down from the roof. They were apprehended after landing

Thu Aug 23 18:30 EDT 2018

πŸ”„ 0
❀️ 1
πŸ”–
Profile picture
Kerbal Space Agency @KSA_MissionCtrl
the effort is underway to setup a mechanical drilling system and see if the reduced healing rate of the Monolith can allow researchers to bore further upwards and still possibly reach the underside at ground level, as mentioned in our last report

Mon Aug 27 15:35 EDT 2018

πŸ”„ 0
❀️ 1
πŸ”–
Profile picture
Kerbal Space Agency @KSA_MissionCtrl
Head of R&D Wernher & his dept still working on Extremis science instruments, Lead Scientist Cheranne has her field team deployed at KSC to help work with Monolith researchers, Lead Engineer Simon is assisting with our TBA jet engine program

Thu Aug 30 12:34 EDT 2018

πŸ”„ 0
❀️ 1
πŸ”–
Profile picture
Kerbal Space Agency @KSA_MissionCtrl
this week some construction vehicles were staged outside the EM field at the Support Village, today they will all be driven into the EM field to see how they fare. As long as their electric starters are used outside the field, their mechanical systems should not be affected

Fri Aug 31 10:05 EDT 2018

πŸ”„ 0
❀️ 2
πŸ”–
Profile picture
Kerbal Space Agency @KSA_MissionCtrl
we just finished evaluating the various construction equipment and the good news is we may be able to get some renovations done while operations are halted. Yup - we are looking at you, runway!

Fri Aug 31 14:33 EDT 2018

πŸ”„ 0
❀️ 1
πŸ”–
Profile picture
Kerbal Space Agency @KSA_MissionCtrl
efforts to get a mechanical drilling rig setup this week have been mostly unsuccessful due to the number of pilgrims in the area protesting the actions and not allowing equipment into the site. Tensions are beginning to rise again as gov't threatens forced removal

Fri Aug 31 18:18 EDT 2018

πŸ”„ 0
❀️ 0
πŸ”–
Profile picture
Kerbal Space Agency @KSA_MissionCtrl
late yesterday seismic sensors picked up a rather strong 5.4 magnitude groundquake less than 50km southeast of Kravass. It's notable because keologists say there are no known fault lines or volcanic activity in the area. A team has been dispatched to investigate

Tue Sep 04 07:55 EDT 2018

πŸ”„ 0
❀️ 1
πŸ”–
Profile picture
Kerbal Space Agency @KSA_MissionCtrl
although several arrests were made, authorities were able to give researchers access to the Monolith site without sparking violence over the weekend so equipment could be hauled in. Researchers now say they plan to begin drilling later this week

Tue Sep 04 18:43 EDT 2018

πŸ”„ 0
❀️ 2
πŸ”–
Profile picture
Kerbal Space Agency @KSA_MissionCtrl
KNN reports drilling has begun. The setup requires 4 kerbals at a time to crank the drill, they have three teams that will work shifts around the clock and stop only to check on drill bit wear, replace as needed and observe overall progress

Fri Sep 07 12:09 EDT 2018

πŸ”„ 0
❀️ 1
πŸ”–
Profile picture
Kerbal Space Agency @KSA_MissionCtrl
latest KNN report from the drilling is that better-than-expected progress is being made. The shaft has already surpassed the point where it was before the EM field kicked in and ground level could be reached sometime late this weekend or early next week

Fri Sep 07 19:25 EDT 2018

πŸ”„ 0
❀️ 1
πŸ”–
Profile picture
Kerbal Space Agency @KSA_MissionCtrl
the Monolith began emitting ultrasonic noise again late yesterday, which forced kerbs to retreat from the immediate area to about 300m outside the dome before the headaches and nausea wore off. Emission ended a few hours ago and KNN reports drilling has just resumed once more

Sat Sep 08 09:26 EDT 2018

πŸ”„ 0
❀️ 0
πŸ”–
Profile picture
Kerbal Space Agency @KSA_MissionCtrl
in case you don't recall, the Monolith had made an ultrasonic noise that prevented close examination in the past. It ceased after the first incident when we reached space and for some reason this is the first time it has returned since twitter.com/KSA_MissionCtr…

Sat Sep 08 09:27 EDT 2018

πŸ”„ 0
❀️ 0
πŸ’¬ View Conversation πŸ”–
Profile picture
Kerbal Space Agency @KSA_MissionCtrl
update on the Monolith drilling operation is that they have once again been forced away. While use of the defense mechanism makes sense and is effective, researchers remain puzzled as to why it stayed silent and even allowed them to get this close for so long

Sat Sep 08 11:53 EDT 2018

πŸ”„ 0
❀️ 1
πŸ”–
Profile picture
Kerbal Space Agency @KSA_MissionCtrl
latest report from the surface is the ultrasonic defenses have stopped again but no decision has been made to resume drilling. Unrest among the pilgrims in the area also growing as they feel they should join in on the Monolith's act of defense & keep gov't teams out of the area

Sat Sep 08 16:40 EDT 2018

πŸ”„ 0
❀️ 1
πŸ’¬ View Conversation πŸ”–
Profile picture
Kerbal Space Agency @KSA_MissionCtrl
once again violence has thankfully been avoided at the Monolith site. Drilling teams have not returned while researchers work on a way around the additional defensive measure & religious pilgrims have mostly gone back to just praying a lot. Gov't forces have left the area

Sun Sep 09 14:11 EDT 2018

πŸ”„ 0
❀️ 3
πŸ”–
Profile picture
Kerbal Space Agency @KSA_MissionCtrl
spending the last few days probing the area of last week's temblor with ground penetrating radar, keologists have enough evidence to suggest a new crystal vein is being grown towards Kravass. Perhaps Umbarg too? Power authorities are considering what actions to take

Sun Sep 09 15:50 EDT 2018

πŸ”„ 0
❀️ 1
πŸ”–
Profile picture
Kerbal Space Agency @KSA_MissionCtrl
astronomers have confirmed UIX-921(C) will be coming down over the water south of KSC. Should present little to no danger - it will occur at low tide which places us nearly 70m above sea level. Still, those still on the surface have been warned (pilgrims too)
Tweet media

Tue Sep 11 15:11 EDT 2018

πŸ”„ 0
❀️ 3
πŸ”–
Profile picture
Kerbal Space Agency @KSA_MissionCtrl
KNN reports power authorities are going to start drifting underground back along the two veins they cut to look for branches. As ideal as it would be to just sever things closer to the source, at greater distances the Monolith should be able to do less to impede them

Thu Sep 13 18:27 EDT 2018

πŸ”„ 0
❀️ 3
πŸ”–
Profile picture
Kerbal Space Agency @KSA_MissionCtrl
Kravass is in the process of restoring power after they had to perform another conduit replacement to eradicate new crystal growth. Umbarg has not yet been affected and teams at both veins are now working around the clock to tunnel in search of any branches

Sat Sep 15 12:13 EDT 2018

πŸ”„ 0
❀️ 1
πŸ”–
Profile picture
Kerbal Space Agency @KSA_MissionCtrl
researchers gained access to the Monolith through the throng of pilgrims and measured the change to the bore hole to discover it had not healed as fast as they would have expected with the power drained from Kravass before the crystals were excised

Sat Sep 15 14:50 EDT 2018

πŸ”„ 0
❀️ 1
πŸ”–
Profile picture
Kerbal Space Agency @KSA_MissionCtrl
surface instruments at KSC recorded no change in the size or strength of the EM field either. Leading assumption is that the energy was used to power greater crystal growth elsewhere, likely new filaments towards Umbarg & Kravass

Sat Sep 15 14:51 EDT 2018

πŸ”„ 0
❀️ 1
πŸ”–
Profile picture
Kerbal Space Agency @KSA_MissionCtrl
latest reports from KNN say no new branches found yet as digging continues around the clock. No new reports of power outages either. Keologists have been studying seismic data around Sheltered Rock & Ockr, saying no obvious sign of crystal growths seen near the caverns

Wed Sep 19 16:17 EDT 2018

πŸ”„ 0
❀️ 1
πŸ”–
Profile picture
Kerbal Space Agency @KSA_MissionCtrl
a branch has been found and severed leading off to Kravass from the main trunk of crystal, reports KNN. The drift along the Umbarg vein has still turned up nothing. Discussion on whether to continue attempts to penetrate beneath the Monolith are ongoing

Mon Sep 24 14:17 EDT 2018

πŸ”„ 0
❀️ 1
πŸ”–
Profile picture
Kerbal Space Agency @KSA_MissionCtrl
the effort to penetrate the Monolith has been indefinitely suspended and the bore hole will be allowed to heal. Current estimates put this happening by mid-November. We still don't know if this will bring about the end of the EM field as well, but everyone is hoping it will

Thu Oct 04 10:14 EDT 2018

πŸ”„ 0
❀️ 3
πŸ”–
Profile picture
Kerbal Space Agency @KSA_MissionCtrl
in a gesture of goodwill the government will continue to allow worshipers to visit the site without oversight. Researchers will continue passive monitoring as well. Due to the ground excavations, the dome will need to remain in order to protect against flooding

Thu Oct 04 10:15 EDT 2018

πŸ”„ 0
❀️ 3
πŸ”–
Profile picture
Kerbal Space Agency @KSA_MissionCtrl
KSA HQ will be offline tomorrow through the weekend for networking infrastructure upgrades, but we've given the ATN kerbs account access so any incoming asteroids will still be reported

Thu Oct 04 17:31 EDT 2018

πŸ”„ 0
❀️ 1
πŸ”–
Profile picture
Kerbal Space Agency @KSA_MissionCtrl
KSA HQ back online, upgrades went well according to our IT kerbs. Surface team assigned to monitoring the Monolith will be making new measurements tomorrow on the bore hole to confirm the rate of closure is holding steady since last week

Mon Oct 08 09:16 EDT 2018

πŸ”„ 0
❀️ 2
πŸ”–
Profile picture
Kerbal Space Agency @KSA_MissionCtrl
bore hole measurements made yesterday show it continues to close at a rate that will see it healed up by mid-Nov. We still have to see whether the EM field drops or further reduces its size but if able to resume surface ops, would work towards Jan '19 Ascension & Progeny launches

Wed Oct 10 11:25 EDT 2018

πŸ”„ 0
❀️ 1
πŸ”–
Profile picture
Kerbal Space Agency @KSA_MissionCtrl
we're pleased to hear from the surface science teams that religious leaders have been working together to keep the amount of pilgrims around the Monolith at any one time to manageable levels, ensuring that once KSC is back to operations we do not need to support them as well

Tue Oct 16 11:53 EDT 2018

πŸ”„ 0
❀️ 1
πŸ”–
Profile picture
Kerbal Space Agency @KSA_MissionCtrl
with cessation of major science studies KNN has also reported that religious leaders have begun talks with scientists and government officials on the possibility of converting the Monolith dome into a temple along with a more permanent settlement in the immediate vicinity

Tue Oct 16 11:54 EDT 2018

πŸ”„ 0
❀️ 2
πŸ’¬ View Conversation πŸ”–
Profile picture
Kerbal Space Agency @KSA_MissionCtrl
we're getting weekly status reports from Lead Scientist Cheranne's surface team monitoring the Monolith's healing progress. Bore hole closure rate remains constant, as does the EM field. Sonic defenses remain inert even on close approach

Thu Oct 18 17:22 EDT 2018

πŸ”„ 0
❀️ 2
πŸ”–
Profile picture
Kerbal Space Agency @KSA_MissionCtrl
after nearly a month of digging, drift tunneling along the crystal veins leading from the Monolith to Kravass and Umbarg was halted today. No further branches were discovered. The past 2wks scientists have installed seismic sensors to monitor the rest of the vein lengths

Wed Oct 24 17:31 EDT 2018

πŸ”„ 0
❀️ 0
πŸ”–
Profile picture
Kerbal Space Agency @KSA_MissionCtrl
Monolith update: still looking at mid-Nov for bore hole to finish healing, we should have an exact date next week. Chipping off just a few small crystal samples to analyze activated the sonic defense for about 3 hours. The edifice is certainly not tolerating further interference

Thu Oct 25 09:24 EDT 2018

πŸ”„ 0
❀️ 1
πŸ”–
Profile picture
Kerbal Space Agency @KSA_MissionCtrl
crystal base of the Monolith continues to heal at its constant pace, which will see the bore hole closed over by 11/17. EM field remains constant as well. No growth reported on either crystal stubs of the veins that were severed and no power issues in Kravass or Umbarg

Thu Nov 01 09:00 EDT 2018

πŸ”„ 0
❀️ 1
πŸ”–
Profile picture
Kerbal Space Agency @KSA_MissionCtrl
astronomers have confirmed the inbound trajectory of YGD-619(C), which entered our SOI early today. It was discovered back on 10/23 so preparations have been underway in Umbarg since then to ensure a ground impact will not cause serious damage within the underground caverns
Tweet media

Tue Nov 06 15:19 EST 2018

πŸ”„ 0
❀️ 2
πŸ”–
Profile picture
Kerbal Space Agency @KSA_MissionCtrl
at 2.6 kilotons it's actually quite light for a Class-C, meaning there's a good chance it's a loose rubble pile that will break up on entry. Still, everyone is preparing for the worst. This is the closest entry point to date near a populated area since twitter.com/KSA_MissionCtr…

Tue Nov 06 15:20 EST 2018

πŸ”„ 0
❀️ 2
πŸ”–
Profile picture
Kerbal Space Agency @KSA_MissionCtrl
Monolith remains on track to seal over bore hole by the 17th, no further sampling or direct contact has been made by researchers. EM field remains constant. Pilgrim traffic remains manageable as well for the existing shanty town surrounding the containment dome

Thu Nov 08 12:50 EST 2018

πŸ”„ 0
❀️ 0
πŸ”–
Profile picture
Kerbal Space Agency @KSA_MissionCtrl
2 hrs until atmospheric entry of YGD-619(C) & final prep is underway in Umbarg. All who could have evacuated to the other 3 cavern systems, all who remain have been moved to the inner walls away from the large open spaces in the central areas. Emergency services standing by

Thu Nov 08 17:21 EST 2018

πŸ”„ 0
❀️ 0
πŸ”–
Profile picture
Kerbal Space Agency @KSA_MissionCtrl
KSA HQ has been evacuated fully, as we are near the middle of the main cavern, whose ceiling is about 200m above us. Hopefully rockfall damage is minimal. We'll be standing by in Kravass to the north for word on the aftermath of the event

Thu Nov 08 17:22 EST 2018

πŸ”„ 0
❀️ 0
πŸ”–
Profile picture
Kerbal Space Agency @KSA_MissionCtrl
remote observation of the event was knocked offline from the compression wave of the airburst that occurred at ~4.5km ASL when YGD-619(C) slammed into the denser lower atmosphere. It had already partially broken up before hand but still was a frighteningly forceful explosion

Thu Nov 08 19:26 EST 2018

πŸ”„ 0
❀️ 0
πŸ”–
Profile picture
Kerbal Space Agency @KSA_MissionCtrl
reports from Umbarg are good. Very minor rock falls, keothermal power remains online and cavern officials have already said they hope to clear kerbs to return within the next 4-6 hours. Airships will soon be enroute to check out the airburst location

Thu Nov 08 19:28 EST 2018

πŸ”„ 0
❀️ 0
πŸ”–
Profile picture
Kerbal Space Agency @KSA_MissionCtrl
the grasslands are burning on the outskirts of the airburst area, several minor impact craters have been found. Researchers'll have to wait for the conflagration to die down bfore they can pick thru the area for meteorite samples, which could take a day or 2 depending on weather

Thu Nov 08 21:05 EST 2018

πŸ”„ 0
❀️ 4
πŸ”–
Profile picture
Kerbal Space Agency @KSA_MissionCtrl
a grisly discovery was made today by meteorite hunters of 7 bodies a few km from the epicenter beneath the airburst. They appear to have died from the compression wave traveling along the ground. Monolithic totems carried on their persons reveal them to be religious followers

Sun Nov 11 15:07 EST 2018

πŸ”„ 0
❀️ 1
πŸ”–
Profile picture
Kerbal Space Agency @KSA_MissionCtrl
we consider this to be a very sad result of all the absurd theories that sprung up after the passage of bit.ly/Pilirani, where many Monolithic followers believed it was really an alien space ship that had come through to take away the True Believers πŸ™

Sun Nov 11 15:08 EST 2018

πŸ”„ 0
❀️ 0
πŸ”–
Profile picture
Kerbal Space Agency @KSA_MissionCtrl
we and the rest of the scientific community are not pleased to see religious leaders failing to condemn the actions of the kerbs that waited on the surface for "deliverance". They are saying their "souls are traveling the stars". We respect their choice but don't believe in it

Mon Nov 12 13:42 EST 2018

πŸ”„ 0
❀️ 0
πŸ”–
Profile picture
Kerbal Space Agency @KSA_MissionCtrl
we are now just 2 days from projected closure of the bore hole into the crystal base of the Monolith. EM field remains stable - scientists were hoping to see it begin to reduce by now. A large influx of pilgrims has begun to arrive for what they believe will be an event this wknd

Thu Nov 15 11:47 EST 2018

πŸ”„ 0
❀️ 0
πŸ”–
Profile picture
Kerbal Space Agency @KSA_MissionCtrl
today's first checkup of the Monolith bore hole has found it is now completely filled in and the surrounding area is even resurfaced. Religious followers have already been gathered and praying for hours now. No effect seen so far on the EM field

Sat Nov 17 09:40 EST 2018

πŸ”„ 0
❀️ 1
πŸ”–
Profile picture
Kerbal Space Agency @KSA_MissionCtrl
EM field remains stable. Lead Scientist Cheranne is out in the field but the researchers she assigned to monitor the Monolith are keeping a nonstop watch on its status. If any change occurs, we will know immediately. No other activity from the Monolith has yet been reported

Sat Nov 17 18:24 EST 2018

πŸ”„ 0
❀️ 1
πŸ”–
Profile picture
Kerbal Space Agency @KSA_MissionCtrl
EM field status remains unchanged. Researchers are just hoping there is still some internal work that needs to be done within the crystal structure that makes up the base before the Monolith has no further reason to keep the field active

Sun Nov 18 14:30 EST 2018

πŸ”„ 0
❀️ 1
πŸ”–
Profile picture
Kerbal Space Agency @KSA_MissionCtrl
we just got word from the surface that the EM field has collapsed down to 150m! It will continue to be monitored this week and if it looks to be holding steady we'll begin the work of getting the affected buildings back up to operational status over the next few weeks

Mon Nov 19 04:53 EST 2018

πŸ”„ 0
❀️ 2
πŸ”–
Profile picture
Kerbal Space Agency @KSA_MissionCtrl
apparently when told of the field reduction all the pilgrims packed in even closer to the Monolith dome, convinced it meant the healing energies were now more concentrated for them. That's their belief - there is no scientific evidence that an EM field can heal you of anything

Mon Nov 19 05:22 EST 2018

πŸ”„ 0
❀️ 1
πŸ”–
Profile picture
Kerbal Space Agency @KSA_MissionCtrl
EM field remains stable at 150m, no other outward activity detected from the Monolith. Pilgrims still holding vigil, awaiting "spiritual deliverance" according to those in charge

Mon Nov 19 17:41 EST 2018

πŸ”„ 0
❀️ 0
πŸ”–
Profile picture
Kerbal Space Agency @KSA_MissionCtrl
crowds have mostly dispersed from around the Monolith. Whether or not deliverance was granted we are not sure but researchers are happy to have easier access again. EM field still holding at 150m - it's possible this could be maintained indefinitely

Tue Nov 20 16:08 EST 2018

πŸ”„ 0
❀️ 0
πŸ”–
Profile picture
Kerbal Space Agency @KSA_MissionCtrl
the 150m radius is a bubble, so it would also exclude airspace above the dome however the airspace floor over KSC is 1km so that would not be an issue. Could affect future runway placement but otherwise will not pose any problems for future KSA operations at KSC

Tue Nov 20 16:09 EST 2018

πŸ”„ 0
❀️ 1
πŸ”–