Captain Jebediah and Commander Valentina take a loop around the region of KSC to test out a new radial mystery goo containment unit slung underneath the aircraft
Tag Archive: Valentina
May 21 2018
Deuce Science Flight 5
Commander Valentina and Captain Jebediah perform an aerial survey of a mountainous region dubbed Area B-1F while also testing out a new camera for the Ascension program
May 10 2018
Deuce Science Flight 4
Captain Jebediah and Commander Valentina make another attempt to reach Area KV-001 and also fully explore the region of potentially hazardous radiation over the northern ice caps
Apr 30 2018
Civvie Science Flight 34
Commander Valentina is tasked with flying out over the western Grasslands to Sector M16CX in order to gather atmospheric samples for the Field Research Team to keep track of pollen levels
Apr 27 2018
Deuce Science Flight 3
Commander Valentina and Captain Jebediah head back home with the newly-built Deuce on its first cross-country flight, swinging past Zone 64K-9M to conduct an aerial survey along the way
Apr 24 2018
Deuce Engine Test 2
Captain Jebediah and Commander Valentina head back out in the new Deuce to put the engines through the real test – high G maneuvers – to ensure they remain running properly, unlike last time
Apr 23 2018
Deuce Engine Test 1
Commander Valentina and Captain Jebediah take a newly-designed and constructed Deuce out for a shakedown flight with the primary goal of testing the new Pegasus engines designed for aircraft use
Apr 09 2018
Surface Operations Set to Resume by Executive Order
Amazing news came out of Sheltered Rock today when the Presider himself contacted our Operations Director and Founder Drew Kerman to say he was using his executive powers to sign the amendments into law, bypassing the Assembly. This unprecedented move has tied the fate of his political career to the success of the Kerbal Space Agency, and we recognize his faith in us and plan to ensure his re-election next year by bringing kerbalkind fully into the space age. The actual signing will take place tomorrow to allow KSC and other surface structures, like the Monolith project and airports, to resume operations by Wednesday. We will be moving staff and equipment back to KSC from Umbarg over the next few days to be fully up and running again by the end of the week. Everyone is excited to really be getting back to work!
First up next week we will begin testing the K2-X engine while the VAB begins to assemble the next Progeny Mk6 Block I rockets for quick successive launches with four days turnaround time. Sheltered Rock General Airport will be able to begin the final assembly of the new Deuce aircraft this week, for completion later this month. Captain Jebediah and Commander Valentina will remain in Sheltered Rock to assist and perform testing. Specialists Bill and Bob will be getting new KerBalloons ready for launch, with an expedition being planned for next week.