Aug 28 2019

Ascension Mk1 Flight 8 (Science Studies)

With a capsule modified solely for unkerbed flight, new science instruments were installed. The mission’s goals also included continuing to push the capsule to the limits on return to attempt to find any failures

View full tweet timeline »

Aug 23 2019

Operations Summary – Week of 8/19/19

View post on imgur.com

View operations details »

Aug 19 2019

KerBalloon Joint Science Survey

Both the high- and low-altitude crews set out together aboard the MSV Tongjess to release over several locations, with the low-alt crew at sea and high-alt dropped off on an island with UTVs

View full tweet timeline »

Aug 16 2019

Operations Summary – Week of 8/12/19

View post on imgur.com

View operations details »

Aug 13 2019

Civvie Science Flight 40

Captain Jebediah takes time off from Ascension mission training to complete a final atmospheric sampling run over Area ATM-14 that will end a 2-year study on regional tree pollen levels

View full tweet timeline »

Aug 09 2019

Operations Summary – Week of 8/5/19

View post on imgur.com

View operations details »

Aug 06 2019

Ascension Mk1 Flight 7 Analysis

Finally, after nearly 3 years of rocket development, the time had come to launch a kerbal into space! While we expected there might be some issues during the mission no one was ready for the Monolith to make another attempt at keeping us grounded. After Specialist Bob was loaded up into the rocket and it was raised vertical on the pad, atmospheric pressure began to decline shortly after it was powered up, a sign that storms were forming. This storm was being generated by the Monolith and was last seen to impact rocket flights back in February. Since then a cooling system was installed to prevent the storms and it appeared to work until this flight, which led us to develop a new theory as to why the Monolith was generating the storms in the first place.

The Flight

Rattled from his experience in the capsule during the storm, Bob ceded his spot to his backup Specialist Bill, who boarded the rocket 6 days later after a new cooling unit was installed around the Monolith and a day’s delay due to weather. Pre-launch operations proceeded without issue leading up to the 5 minute GO/NO GO poll, which failed due to upper-atmospheric wind conditions that neared the launch commit limits for flight. After some discussion among the launch team, using our experience with past Ascension missions, the decision was made to proceed with the launch. The countdown resumed and the rocket lifted off the pad with Bill atop it at 15:58:00.20 local time.

Read the rest of this entry »

Aug 02 2019

Operations Summary – Week of 7/29/19

View post on imgur.com

View operations details »

Jul 26 2019

Operations Summary – Week of 7/22/19

View post on imgur.com

View operations details »

Jul 24 2019

Ascension Mk1 Flight 7 (Specialist Bill)

Although only one of them can ultimately be the first kerbal into space, both Specialists Bill & Bob are prepared to fly aboard the capsule atop the rocket that will carry one of them into the history books

View full tweet timeline »

Older posts «

» Newer posts